2d Shop Drawings

banner13

Shop drawings are typically a set of drawings required for prefabricated components and include dimensions, manufacturing standards and fabrication details. Architectural building information modeling (BIM) has its roots in conventional 2D shop drawing.

With the shift in the construction industry from AutoCAD to BIM, the demand for BIM services has increased, and this mostly consists of BIM drafting, BIM modeling, clash detection, BIM coordination and other pre-construction designing services. 

BIM drafting services offer a complete pre-construction road-map of the building project to the clients by combining the structural, architectural and MEP services .

Let us check how BIM drafting services help different sectors of a building project.

For architects or engineers:

  • Design prototype: space arrangements, materials, assemblies
  • Building systems coordination: clash detection, space reservation
  • Analysis: lighting, energy, space
  • Engineering accuracy: measurement, context
  • Drawing production quality

For contractors

  • Risk reduction for a better understanding of the complexity and transparency
  • Shop drawing reduction
  • Building systems coordination for clash detection and layout
  • Construction schedule optimization
  • Cost estimation and quantity take-offs
  • Improved design quality for better-performing building
  • Enhances schedule compression
  • Provides efficient handover

Why choose Excelize?

  • We customize our BIM drafting services in line with our clients’ requirements. We conduct active discussions with them to acquire a clear picture of their requirements and prepare a systematic plan and set specific deadlines for deliverables.
  • We deliver accurate elevations floor plans and sections as well as schedules, area calculations, and quantity take-offs according to clients’ requirements. 
  • Our technical expertise, resolute quality standards, and experienced professionals are adroit at handling a host of diverse building projects.
  • We specialize in shop drawings for all trades and on multiple platforms so that they can be directly fed into the pre-fab software.
  • We actively follow the latest industry developments and new innovations in software.
  • We strictly adhere to industrial norms and the codes specific to the construction industry which significantly improves the project quality.

Looking to outsource BIM? Talk to our experts, now!

We will be glad to assist you!