BIM As Builts

operation12

As-built1As-built2

 Our team of experts specialize in delivering BIM as built drawings, which are extracted from the BIM models created or even from the former drawings. 

As the building information modeling (BIM) in architectural design is spread across the construction industry, the need to create accurate as-built BIM data for existing buildings is also rapidly increasing. With an accurate as-built model of the existing building structure, the owners can visualize and analyze proposed retrofit suggestions and solutions and they can verify whether these solutions satisfy their requirements and provide them with the best value. The increased awareness of green gas emissions, building energy consumption and LEEDTM also enhance the demand for new as-built documents based on BIM.

Excelize ensures the most reliable as built services that consist of providing as-built documentation for the existing buildings assuring accuracy and acceptance. BIM as built services provide the following:
• Top view diagrams of a building level that shows all exterior and interior partitions and walls including permanently attached items.
• The orthographic drawings of the front, sides or real face of a building structure that shows the material, design and dimensions.
• Using BIM as-built, we get a plan with accurate and complete dimensions of the boundaries of the site and the location of all buildings.
• It gives the electrical and lightning plan of existing conditions including the location of all fixtures, switches and controls for electrical distribution along with all lighting fixtures.
• We get the list of all the differing windows, sashes and doors in a building with its type, width, height, material and quantity.

We know that each owner or builder has a different often overlapping set of needs. We at Excelize try to provide as built standards that satisfy the needs of the clients.

Looking for outsourcing BIM services, don’t hesitate “Talk to our Experts” and get answers for your queries.
Team Excelize will be glad to assist you!