Bim Drafting

banner13

With the shift in the construction industry from AutoCAD to BIM, there has been an increasing demand from all around the globe for BIM services, which mostly consists of BIM drafting, BIM modeling, clash detection, BIM coordination and other pre-construction designing services. 

Excelize offers customized BIM drafting services that suit the particular needs and demands of clients. Construction managers, MEP engineers, structural designers, architects, contractors, subcontractors, owners, facility managers and project managers approach us for efficient BIM drafting services. We provide cost-effective BIM drafting services that help make our clients’ costs more competitive.

USES OF BIM DRAFTING SERVICES

BIM drafting services offer a complete pre-construction model of the building project to the clients by combining the structural, architectural and MEP services and by adding the essential fourth element of time. BIM drafting services deliver accurate elevations floor plans, sections, as well as schedules, area calculations and quantity take-offs according to clients’ requirements. Let us check how BIM drafting services help the different sectors of a building project.
For Architects or Engineers

  • Design prototype: Space arrangements, materials, assemblies
  • Building Systems coordination: clash detection, space reservation
  • Analysis: lighting, energy, space
  • Engineering accuracy: Measurement, context
  • Drawing production quality

For Contractors

  • Risk reduction for a better understanding of the complexity
  • Shop drawing reduction
  • Building systems coordination for clash detection and layout
  • Construction schedule optimization
  • Cost estimating and quantity take-offs
  • It improves design quality that results in better performing building
  • It reduces change orders
  • It facilitates schedule optimization
  • It enhances schedule compression
  • It provides efficient handover
  • It offers risk reduction through more transparency

ADVANTAGES OF CHOOSING EXCELIZE FOR BIM DRAFTING SERVICES

Excelize is well equipped with advanced technology as well as rich with systematically trained and highly experienced professionals. We can, therefore, fulfill the requirements of various types of large and small-scale building projects. As we conduct active discussions with our clients to get a clear picture of their demands about their projects and make a systematic plan as per the points in the discussions, we don’t face difficulty to deliver them BIM draft services on a specific deadline without compromising in quality and accuracy. The main benefits of our BIM draft services are briefed here.

  • Cost saving through accurate estimation of resource usage
  • Delivery of projects with a fast turnaround time
  • Operation at a reduced cost
  • Improved project quality

We actively follow the latest industrial development and new innovations in software as a part of our daily working. As a result, we can upgrade our techniques and stand in the front row among other competitive service providers in the market. We also strictly adhere to the industrial norms and the codes specific to the construction industry that significantly reduce the miscalculation in terms of efficiency on our services. As developing a strong bond with the clients is our primary motive, our teams of customer service personnel help clients with service related queries always.

Have a new project, discuss the project requirements with our Team of Experts. Team Excelize will be glad to assist you!