Get a Quote

Construction Documentation Services

 

Excelize has been delivering comprehensive construction documentation services to its clients for a decade. 
Constructing a building is not an easy or simple task, but is a systematically coordinated procedure that includes various stages and the effort of several people from designers, architects, contractors and laborers to owners. That is why clear and detailed documentation of all the steps involved in the construction is very necessary to have an error-free workflow and thus to get a good output.

Construction documentation is a set of comprehensive drawings, which provides sequential data related to the steps of the construction procedure. The information in the construction documentation is useful to those involved in the construction industry such as builders, contractors, etc. Construction documentation sets are used to communicate the design intent and specifications to the design professionals, contractors, engineers, manufacturers, and suppliers.

Let us check the steps of construction documentation.

  • As the first step, clients’ project ideas are reviewed, and their needs and vision about the projects are discussed.
  • Next, the site is inspected and photographed for utility locations terrain, drainage, accessibility and aesthetic values for maximum performance and future value. The findings are discussed with the clients before the formal presentation of design concepts.
  • The design team including consultants like civil, mechanical, structural, and electrical engineers use the design features and building systems that target the needs of the clients to develop an efficiently designed space.
  • Construction documentation produces detailed Shop drawings
Construction Documentation Services
 
 
Benefits of outsourcing

Benefits of outsourcing Excelize for construction documentation services.

Construction documentation service increases the clients’ return on investment. The main advantages of choosing Excelize for construction documentation are:

• We provide end-to-end solutions for your construction project.
• Our staff can offer 24×7 support to the clients.
• We ensure reduced turnaround time for the process.
• We offer flexible and tailored solutions for all requirements
• Our construction documentation service enhances easier collaboration and dispute solutions.
• It reduces the risk of losing both time and money significantly.

As we can provide superior perspectives, our clients will be able to make superior decisions on their new building project. We have vast experience in providing construction documentation for several large and small building projects.

>

Ready to adopt and benefit from BIM, with Excelize?

Contact Us

Sectors we work in

Commercial
Commercial
Residential
Residential
Industry
Industry
Hospitality
Hospitality
Education
Education
Healthcare
Healthcare
Retail
Retail
Airports
Airports
Infrastructure
Infrastructure
Metro Rail
Metro Rail

Portfolio

With over 1500 projects to our credit across diverse sectors and around the world, we truly are a global company in every sense. No matter the scale or complexity of your project, we deliver on our promise of unrivaled BIM expertise.

International airport terminal

International airport terminal

Project Area:480,000M2

What we did:Our scope of work essentially comprised of building a BIM model, to include clash detection and resolution, and vital coordination between the architectural, structural and services (MEPF) teams. For this, we leveraged our team of on-site as well as off-site coordinators and modelers, to create the resolutions of the model and build the model at LOD 300, respectively.

Metro rail project

Metro rail

Project Area:18 Miles, with a total of 38 stations

What we did:We were the 5D BIM consultants on this prestigious project and worked alongside consortium partners to facilitate 3D modeling, clash detection and conflict resolution. Leveraging the Bentley platform, namely AssetWise, ProjectWise and RIB iTWO, we created models, project schedules, construction sequencing and what-if scenarios.

School project

School

Project Area:270,000 Sq. ft.

What we did:For this high school building, we generated a BIM model at LOD 300, to consider the architectural and structural elements involved. We also worked on the exterior elevation details and materials, in addition to the site landscape and site elements. We created the BIM model from the input Point Cloud Data.

About Excelize
Global Locations
Follow Us On
Copyright © 2022 Excelize All Rights Reserved. | Privacy Policy