Contact Us

MEP Design & Drafting Services

Excelize , offers superior quality, cost-effective and time-bound Mechanical, Electrical and Plumbing (MEP) Engineering design support services. Our team is experienced in conjunction with fully-equipped fabrication design and extensive engineering expertise. We have been working with SoCal’s leading All-service mechanical contractors, offering exceptional and diversified fabrication, with preconstruction and project management experience from concept to completion.We have one of the ‘best-in-class’ team of Engineers, Estimators and Project Managers. They have the expertise necessary to service Company’s and Institution’s new projects, services design and support needs. Listed below, are the full array of programs we provide, to keep the system operational costs, low for the clients. We also offer a Controls and Analytic division, using Integrated Building Technologies, help create intelligent buildings and providing cutting edge solutions to the Plumbing, HVAC/R & Fire Protection industry with a customer focused approach.

Our Engineers manage the engineering process across the entire life cycle of the Design process from initial design development (0% DD) through plan-check execution. The Design Management team is responsible for all engineering deliverable across the entire Design project including plumbing plans (P-Sheets), Building Information Models (BIM), Isometric drawings (ISO), list of materials on each ISO (Cut-sheets) and the project’s entire Bill of Material (BOM). These engineering deliverable are completed for all of the project’s integrated systems.

Outsourcing MEP Design services to Excelize will result in reducing your project design cost while maintaining the same quality & drawing standards. Contact Us Today !