Onshore Offshore Working Model Hybrid

banner13

In this new model developed from the offshore working model Excelize has extended its resource support to client’s territory of work by sending BIM Project Manager to client’s overseas site/office

 Excelize with its experience of 12 Years in Design Documentation (CAD), Building Information Modeling (BIM) Services, Pre-Construction Services, and Design Management Services has pioneered the concept of offshore working model, dedicated studio working model and now the new onshore + offshore (Hybrid) working model to provide the most effective way to manage outsourced BIM services 

• Offshore Working Model
• Dedicated Studio Working Model
• Onshore + Offshore Working Model (Hybrid)

Offshore Working model
In 2004, Excelize was launched as an architectural outsourcing firm providing CAD drafting and design management services to clients in the US and India, the majority of the work then was outsourced from the US and this was the traditional working model.
Excelize developed this model into a robust mechanism to deliver outsourced design documentation works in AutoCAD and BIM to international standards.
Figure 1.0 explains the offshore working model in detail


Figure 1.0 Offshore working model

Dedicated Studio Working Model
12 years of experience in providing CAD and BIM services, many of our clients are repeat clients, Excelize became the preferred services provider for these clients across the globe.
This led Excelize to build a dedicated team for these clients and thus the dedicated studio model came into existence.


Figure 2.0 Dedicated Studio Working Model

New Model – Onshore + OffshoreWorking Model (Hybrid)
In this new model developed from the offshore working model Excelize has extended its resource support to client’s territory of work by sending BIM Project Manager to client’s overseas site/office.


Onshore + Offshore Working Model (Hybrid)

Benefits of Hybrid Working Model
• Availability of onsite BIM project manager during clients working hours, the communication became faster and effective thus reducing the turnaround time significantly.

a) Reverting quickly to issues as soon as issue surfaces on site
b) Help site team for coordination and raise RFIs and respond to RFIs from Subcontractors

• Excelize Project Manager became part of client’s team
c) To solve complex structure constructability issues with BIM enabled drawings.
d) To resolve issues during construction/ services installation

Excelize’s Project manager’s proficiency to handle the BIM model helps the client and all stakeholders to understand complex designs in 3D, planning logistics on site, maintain project schedules via 4D BIM.

“Looking to outsource BIM, don’t hesitate “Talk to our Experts” and get answers to your queries.
“Team Excelize would be glad to assist you! ”