2D CAD Drafting

banner12

Project Name: Generation of 2D Drawings from BIM Model

 

Scope of work of Project:

Excelize was appointed as a BIM consultant on this township project to assist the client team to generate BIM model of the towers and the entire site based on the set of layouts and details received from the clients. Our scope also included generating set of GFC (Good for Construction) drawings.

2D Documentation:

The final drawing output was a set of 2D GFC drawings that were generated from the BIM model and submitted to the client. This set of drawings were further released to various contractors.