MEP Modeling & Coordination

banner5

Project Name: MEPF Model of a 5 Star Hotel

Project Details & Scope of Work:

This is a 5 Star Hotel project. Excelize has generated a BIM model for this project spread over an area of around
3, 00,000 sq. ft. Scope of work for this project was to develop a 3D BIM using Revit as per the drawings received from consultants.

The MEPF model generated was used to identify clashes between various disciplines and to resolve them to get a coordinated model.