Real Estate Developers

banner13

 Real Estate Developers are the prime beneficiaries of BIM services. We have been fortunate to have an exposure of working with renowned real estate developers across the world, offering them solutions in 5D BIM, 3D BIM Modeling services, 3D CAD services, CAD conversions and BIM consulting on their entire project from pre-construction to construction stage. 

BIM has achieved wide acceptance from various stakeholders of a project in the AEC industry. These include Architects, Engineers, Design-build contractors, General Contractors and Real estate developers. The real estate developers being the owners of a projected yield the maximum benefit on the projects.

The best time for the real estate developers to implement BIM on projects is at the very start of the project. BIM is the only guide that helps increase transparency and creates an integrated design and construction process. This results in better quality buildings at lower cost and in a short time frame.

At Excelize we are currently working with Real Estate developers our major market being India and the US, UK, Middle East, Europe & Australia. We have helped our clients understand what BIM can do for the project. We have also been able to show how BIM can improve their strategic planning, support decision-making processes, and maximize the ROI on their upcoming projects.

Excelize has been successful in showing the developers the cost reduction factor by implementing BIM on their projects along with the production efficiency of the project. We have helped the developers anticipate the cost of a project which in turn has helped them in good financial management.

BIM for Real Estate Developers can achieve the benefits mentioned below:

  • Take advantage of shifting from 2D to 3D (BIM), to understand and manage BIM
  • The virtual model of the building would help the onsite team in eliminating coordination issues and many imperfections in the construction process.
  • High level of coordination can be achieved through better process optimization & integration of information.
  • Reduction in overall cost of the project by problems identified prior to the construction of the project and cutting down on rework.
  • It will help in timely completion of every project and also increase profitability for the real estate developers.

BIM solutions like architectural BIM Modeling, BIM coordination and clash detectionMEP BIM Modeling4D BIM Scheduling and 5D BIM cost estimation are some of the services of prime interest to Real Estate Developers.

Have a new project, discuss the project requirements with our Team of Experts. Team Excelize will be glad to assist you!