Driven by the need to improve the quality of buildings, and to reduce the costs of designing and maintaining them, building owners, design teams, contractors, and facility managers are seeking ways to share information more effectively. Building Information Modeling (BIM) is therefore the natural corollary to Design Management Services.


The building information Modeling (BIM) is a new tool used by the architecture, engineering , and construction (AEC) industry. It allows you to create sophisticated, intelligent models that expand communication to all members of the project.




Benefits of BIM

  • 80% reduction in time to generate estimates
  • 10% saving on construction cost through clash detection
  • 20% saving through construction process simulation
  • 7% saving in construction time
  • 40% elimination of unbudgeted changes
  • 60% reduction in Request for Information
  • It eliminates on-site rework, saves time and keeps budgets in check

BIM is used for design decision making, production of high-quality construction documents, predicting performance, cost estimation, clash detection, construction planning and simulation, and, eventually, to manage and operate the facility. As the project design evolves, the model is further refined so that the structure, mechanical systems and other components are incorporated. In this way, all the building elements are completely coordinated and constructability issues are resolved well in time. Throughout the entire process, accurate and detailed information is readily available, communication is clear and timely, and decisions can be made before their cost implications become a significant problem.


It is anticipated by proponents that BIM can be utilized to bridge the information loss associated with handling a project from design team, to construction team and to building owner/operator, by allowing each group to add to ,and reference back to all information they acquire during their period of contribution (add) to the BIM model.


Over the last four years, Excelize's team has worked on a wide variety of projects including hotels, resorts and spas, corporate office buildings, mega malls, huge retail centers, schools and higher educational institutions, University Campuses and a large number of residential projects. We have helped Architects, Structural and Services consultants (MEPF) in modeling architectural, structural and MEP components.


Excelize uses a suite of powerful software tools to flawlessly execute any BIM project, including Revit Architecture, Revit MEP, Revit Structure, ArchiCAD and Navisworks for clash detection.