Get a Quote

ARCHITECTURAL BIM SERVICES

 

Excelize offers a range of architectural BIM modeling services, assisting its customers to better visualize the project before it enters the construction stage.
Excelize is a one-stop solution for all your architectural BIM modeling requirements. Our architects, engineers, and construction professionals are well aware of the numerous benefits that a BIM-based design process offers, they prefer BIM to other platforms. As a result, we can promise our clients that they will get a perfect result in the most effective manner.

The architectural BIM modeling services provided by Excelize touch all the areas including creating building information models from sketches, CAD drawings, documentation in BIM, analysis, Cash Detection and content creation. We work with our clients through the design process from schematic design to design development and construction documentation and are responsible for complete BIM modeling.

Architectural BIM Services
Key Benefits For Clients

 

Key Benefits For Clients

  • Reduce risk
  • Reduce change orders
  • Schedule optimization
  • Schedule compression
  • Improve design quality
  • Efficient handover

Our architectural BIM modeling services deliver accurate and up-to-date information about the design scope, costs, quantities and all other properties of the building components.

 

 

The architectural BIM modeling services offered by Excelize extend to maintaining and managing all design changes and project updates. So, the project architect can make better well-informed decisions that will help minimize the design errors. As a result, our expert architects can improve the coordination of drawings and documents that provide seamless integration between design, analysis, engineering, construction and operations for the entire life-cycle of facilities.

Architectural BIM Modeling Services Provided By Excelize

Schematic Design

  • Exterior view of the building
  • Interior view of the building
  • 3D Visualization
  • Intelligent libraries for different building components with various styles and specifications

Design Development

  • Elevations
  • Floor plans
  • Building schemes
  • Information on material specifications, quantities, time schedules and costs

Construction Document

  • Building Sections
  • Staircase/Vertical Circulation details
  • Construction details


 

Improve Efficiency and Profitability

The architectural BIM modeling services create a shared information resource that helps in making the building process client-friendly. It can facilitate the workflow and improve efficiency and profitability.

Improve Efficiency and Profitability

Sectors we work in

Commercial
Commercial
Residential
Residential
Industry
Industry
Hospitality
Hospitality
Education
Education
Healthcare
Healthcare
Retail
Retail
Airports
Airports
Infrastructure
Infrastructure
Metro Rail
Metro Rail

Portfolio

With over 1500 projects to our credit across diverse sectors and around the world, we truly are a global company in every sense. No matter the scale or complexity of your project, we deliver on our promise of unrivaled BIM expertise.

International airport terminal

International airport terminal

Project Area:480,000M2

What we did:Our scope of work essentially comprised of building a BIM model, to include clash detection and resolution, and vital coordination between the architectural, structural and services (MEPF) teams. For this, we leveraged our team of on-site as well as off-site coordinators and modelers, to create the resolutions of the model and build the model at LOD 300, respectively.

Metro rail project

Metro rail

Project Area:18 Miles, with a total of 38 stations

What we did:We were the 5D BIM consultants on this prestigious project and worked alongside consortium partners to facilitate 3D modeling, clash detection and conflict resolution. Leveraging the Bentley platform, namely AssetWise, ProjectWise and RIB iTWO, we created models, project schedules, construction sequencing and what-if scenarios.

School project

School

Project Area:270,000 Sq. ft.

What we did:For this high school building, we generated a BIM model at LOD 300, to consider the architectural and structural elements involved. We also worked on the exterior elevation details and materials, in addition to the site landscape and site elements. We created the BIM model from the input Point Cloud Data.

Ready to adopt and benefit from BIM, with Excelize?

Contact Us
About Excelize
Global Locations
Follow Us On
Copyright © 2022 Excelize All Rights Reserved. | Privacy Policy