Coordination Cost Calculator — Excelize
Step 1 of 4 Project Profile
Step 1 — Project Profile

What's your typical project value?

Pick the range that best describes a typical project for your firm. This is the only number we need.

Step 1 — Project Profile

How many projects like this do you run per year?

Approximate is fine. We'll use this to estimate your annual exposure — not a single project.

Step 2 — Your Experience

Think about your last 3 projects.

7 quick questions. No right or wrong answers. Just your honest experience — what you actually saw happen on site.

1
After the model was handed to the field, how often did the crew find things that needed to be redone?
Plumbing in the wrong place. Duct where steel was. Layout that didn't match what the field expected.
Never
🟡
Once
🟠
Sometimes
🔴
Often
2
How often did you have emergency design changes after construction started?
RFIs that halted work. Design updates issued mid-pour. Structural changes after steel was set.
Never
🟡
Once
🟠
Sometimes
🔴
Often
3
How often did the coordination meeting say "resolved" — but the field found it wasn't?
Issues marked closed in meetings that re-appeared on site. Foreman finding problems the BIM said were fixed.
Never
🟡
Once
🟠
Sometimes
🔴
Often
4
How often did trades stop work and wait because of a coordination conflict?
Two trades claiming the same space. Work halted pending model clarification. Crew standing idle waiting for an RFI response.
Never
🟡
Once
🟠
Sometimes
🔴
Often
5
How often did sub-contractors raise disputes or complaints about the model quality?
Model not matching their scope. Missing details. Subs using their own drawings instead of the coordinated model.
Never
🟡
Once
🟠
Sometimes
🔴
Often
6
How often did coordination issues push your schedule by a week or more?
Delays you traced back to model gaps or unresolved clashes. Not weather, not owner decisions — coordination.
Never
🟡
Once
🟠
Sometimes
🔴
Often
7
How many change orders per project came from coordination or design gaps — not owner scope changes?
COs you had to eat. Changes that were clearly a coordination failure but hard to charge back. Margin that didn't come back.
None
🟡
1–2
🟠
3–5
🔴
5+
Step 3 — Gut Check

One last question — honest gut feel.

Setting your personal experience aside — how well do you think your coordination process is working right now? No judgment. Just your honest gut.

Your confidence level 5 / 10
1 — Very concerned 10 — Very confident
Your 3 Starting Points — This Week
Want your exact number — not an estimate?
Book your free 30-minute Coordination Risk Assessment.

In 30 minutes we'll look at your actual active projects, run the real numbers, and hand you a written action plan within 24 hours. Specific to your firm. Yours to keep — regardless of what comes next.

Book Free Assessment Max 8 sessions/month
📊

This estimate is based on rework cost research from the Construction Industry Institute (CII RS-153), McKinsey's "Reinventing Construction" (2017), and the Autodesk/FMI "Construction Disconnected" report (2018). Industry-verified range: 2.4%–12.4% of total project cost. Your result reflects the conservative end of that range for your risk score. This is an estimate — your actual exposure depends on project-specific details a 30-minute assessment can uncover.

← Start over with different inputs ← Return to overview