The benefits of Building Information Modelling (BIM) are well-known. From encouraging collaboration among different stakeholders through common understanding on an interope.....
Worldwide, the construction sector employs the largest workforce and is often considered to be one of the biggest drivers of the economy. In 2018 alone, the annual spending on.....
The construction industry was witnessing only slow growth for more than a decadeeven before the outbreak of the pandemic. With the COVID-19 situation, the industry is probably.....
The current pandemic may have led the construction companies into challenging timesdue to a disruption in the supply chain and shortage in manpower. But not all hope is lost. .....
Besides real estate, tourism, hospitality, and retail, another industry that has been suffering from the brunt of COVID-19 lockdowns is construction and development. Ongoing p.....
The year 2020 has ushered in the times of unpredictability and is anticipated to cause a long-lasting impact on the world economy. COVID-19 has created a situation wherethe de.....
Never before have we experienced a pandemic of this magnitude. It sometimes seems that the entire world has come to a standstill. However, despite the reigning uncertainties, .....
Conceptual estimating has always been a crucial aspect while planning a new construction project. Developers assign costs for every stage of the planning to determine the c.....
I have been a part of the construction industry for many years, and in all that time, I have observed something unexpected about the industry. As much as the feeling is that t.....
Construction engineers are driven to look for ways to improve everything from construction methods, the materials used, to the systems used to develop new building designs wit.....
“To be careless in making decisions is to naively believe that a single decision impacts nothing more than that single decision, for a single decision can spawn a thousand o.....
There’s no longer any question that Building Information Modeling (BIM) has revolutionized the way the AEC industry operates. BIM has delivered a significant impact on long-.....