Get a Quote
International airport terminal

International airport terminal

Project Area: 480,000M2

What we did: Our scope of work essentially comprised of building a BIM model, to include clash detection and resolution, and vital coordination between the architectural, structural and services (MEPF) teams.

Metro rail project

Metro rail

Project Area: 18 Miles, with a total of 38 stations

What we did:We were the 5D BIM consultants on this prestigious project and worked alongside consortium partners to facilitate 3D modeling, clash detection and conflict resolution.

School project

School

Project Area: 270,000 Sq. ft.

What we did:For this high school building, we generated a BIM model at LOD 300, to consider the architectural and structural elements involved. We also worked on the exterior elevation details and materials, in addition to the site landscape and site elements.

Convention center

Convention centre

Project Area: 820,000 M

What we did:Our involvement in this on-going project of a mixed-use international exhibition and convention center requires us to create 3D models for the architectural, structural and MEPF teams. Commencing with the design model, our work will continue through construction as well as the as-built model.

Residential community

Residential community

Project Area: 339,449 Sq. ft.

What we did: We created the model for architectural, structural and MEPF services for this community living structure. By modeling important elements such as casework, fixtures and appliances at LOD 400, we maintained accuracy in the clearances required during construction.

Super- specialty hospital

Super- specialty hospital

Project Area: 77 acres, with a built-up area of 390,182 M2

What we did: This was the first hospital in Doha to have BIM and FM integration. We set up the BIM execution plan and facility management strategy at the start of the project, and then used the data to set up the SOPs for the modeling and facility management.

High-rise residential project

High-rise residential project

Project Area: 650 feet tall with 60 floors

What we did: Our mandate for this tall edifice was to build the BIM model for its electrical services, to enable the Design Build team to use BIM for better coordination. Aligning with sub-contractors to support the coordination process, we updated the model using Revit, based on our meetings.

Hospitality project

Hospitality project

Project Area: 484,000 Sq. ft. with 247 rooms and 25,000 Sq. ft. of retail space

What we did: Our mandate for this project was to generate the BIM model from the AutoCAD input data, to aid the architectural, structural and MEPF services. We created a 4D construction simulation, to track the progress of construction.

IT SEZ

IT SEZ

Project Area: 310,000 M2

What we did:As BIM consultants for this large information technology park, we provided 3D, 4D and 5D services. Using Revit, we created 3D models at LOD 400 for the architectural, structural and MEPF services. We leveraged 5D to extract quantities from the BIM model, to aid the site team with bill verifications and material management.

About Excelize
Global Locations
Follow Us On
Copyright © 2022 Excelize All Rights Reserved. | Privacy Policy