Get a Quote

MEP BIM Services | Consultant

 

We Make It Happen!

 

MEP contractors, MEP consultants, and Design-Build firms leverage BIM to design, detail, estimate, fabricate and install MEP (mechanical, electrical, and plumbing) building systems more quickly and accurately. MEP modeling improves collaboration, streamlines projects, and reduces risk and waste across the project. MEP 3D modeling, CAD services, MEP coordination, etc provide effective synchronization between all the individual parts of a building. We create MEP BIM models for buildings in various sectors like healthcare, and residential, commercial and industrial properties as well as hotels and resorts.

MEP BIM services offered by Excelize

  • Conversion of 2D design drawings to 3D models
  • Coordination among different MEP trades
  • Shop drawings
  • Fabrication drawings
  • Builders work drawings
  • Extraction of Project Information
  • Construction documents
  • Risk mitigation
  • Clash detection
  • Coordinate checking
  • Quantity take-offs
  • Energy analysis
  • Schedules, detailed section views, bill of materials
  • 3D BIM to 4D BIM for scheduling and to 5D BIM for costing
  • Parametric modeling and library creation of HAVC & MEP components
MEP BIM services
Advantages

Advantages

Using Revit family creation services, many more items like curtain wall panels, ceilings, furniture, fixtures, counters, plumbing fixtures, electrical fixtures, machine parts, elevators, insulators and HVAC pumps can be created.

  • We offer precise and comprehensive MEP BIM as per the clients’ demands.
  • We follow international codes and standards while developing BIM of MEP designs to provide detailed MEP services to clients across the world.
  • We ensure a fast turnaround time at a competitive price.
  • Our qualified and experienced professional team follows strict quality measures to meet our clients’ expectations.
  • We keep our clients regularly updated about the progress of their work at each stage of the project.?
  • We use software such as CAD-Duct, Revit MEP, AutoCAD, CAD-Pipe and Navisworks and our staff is flexible in working with inputs from AutoCAD files, GIF or JPEG files, PDF, photos, images, scanned, electronic files, Revit files, and hand-drawn sketches.

Ready to adopt and benefit from BIM, with Excelize?

Contact Us
About Excelize
Global Locations
Follow Us On
Copyright © 2021 Excelize All Rights Reserved. | Privacy Policy