What we did:Our scope of work essentially comprised of building a BIM model, to include clash detection and resolution, and vital coordination between the architectural, structural and services (MEPF) teams. For this, we leveraged our team of on-site as well as off-site coordinators and modelers, to create the resolutions of the model and build the model at LOD 300, respectively.
Unlock the digital deadlocks
Create a win-win situation by leveraginga combination of our insights, expertise, and the genius of technology.
Technology innovation
We are a one-stop shop for MEP, architecture, and engineering firms in the USA. From 3D BIM to point cloud to BIM services, CAD services, Scan to BIM, Revit BIM services, Revit family creation services, and final shop drawings, we deliver intelligent solutions that capture every aspect of your design and build through enhanced construction documentation.


Best-in-class practices
We deliver the promise of effective scheduling, better clash detection and coordination, visualizing, walkthrough creations, etc., all of which improve coordination between teams and ensure safety. The outstanding value we provide as BIM thought leaders lets you realize better returns on your investment.
Intelligent software and infrastructure
We harness the power of the most technologically-advanced software that allows you to derive and measure quantities accurately. With our data-driven approach, you can create estimates, analyze, solve problems of material wastage, etc., and consistently deliver high-quality projects, to create value for your clients.
BIM Services, Building Information Modeling (BIM) is a new way of approaching the design and documentation of various types of building projects. It is an intelligent digital representation of the physical and functional characteristics of a facility.
The evolution of software from traditional to modern BIM technology empowers designers, installers, and cost consultants to take a comprehensive view of the actual elements of a construction project.
The BIM Modeling Services team includes architects, software developers, engineers, management consultants, and designers who bring a diverse perspective and at the same time offer holistic solutions to your problems.
It gives architects, engineers, and construction (AEC) professionals the insight and tools to plan, design, construct, and manage buildings and infrastructure. So, BIM is the natural corollary to Design Management Services (DMS).

BIM supports easy interoperability, flexibility, and facilitates customization. It ensures the best returns on your investments by saving time and aiding the successful execution of your project.
Gaining all these benefits from BIM is not just a matter of using certain tools or technologies. It’s also important to work with the right technology partner who will deliver these gains and more. We are a preferred and trusted BIM Consultant for prestigious construction projects around the world.
Creating a collaborative road-map to deliver the best in BIM Modeling & Coordination Services
Our Platter of BIM Services

Why Choose Excelize?
- Trusted by some of the best-known Design Build Contractors (DBC) and Mechanical, Electrical, Plumbing and Fire (MEPF) firms in North America.
- A team of over 80 experts with a presence in the West and East coasts of the United States, Middle East, and India.
- Our data-driven approach enables people, processes, and technology to deliver a complete solution to clients.
- We leverage the latest technology solutions and design software from Autodesk and Bentley, to create digital representations, customized in line with our client's requirements.
- Knowledge of building codes of the different states within the USA, Canada, as well as European standards.
Our Company offices in the USA and Doha enable close coordination with your team. Our development center in India enables us to leverage time zones, and deliver results to our US-based clients round-the-clock.