Coordination problems bleed your budget silently, buried inside change orders, rework, and delays that look like "normal project costs." This free calculator shows you the real number in 2 minutes.
Free. No email required. No sign-up. Two minutes.
Every week, your projects absorb small losses that nobody traces back to the real cause. They get called "project complexity." They get filed under "design changes." They become the new normal.
The real cause is a coordination gap, happening before the field ever sees the model.
"We assumed rework was just part of the process. We didn't know it had a number."
"We've worked on 2,500+ projects across 21 years. Coordination failures always cost more than they appear, and they always show up in the same places. We built this calculator because you deserve to see your number before it's too late to change it."
No technical data. No preparation. Answer to three simple questions you already know.
One number. Your typical project value. That's all we need to scale your result to your reality, not a generic average.
About your last 3 projects. What happened on site. No right or wrong answers, just your honest experience.
A specific dollar estimate plus 3 actions you can take this week, no consultant needed, no BIM team required.
No sign-up. No email. No commitment. You see your number and you keep it. That's the whole transaction.
The Problem
Clashes found after design was locked. Coordination meetings happening but not following through to field.
What We Did
Unified coordination gate across all disciplines. Single model standard before any field handoff.
The Result
Zero structural clashes during construction. Delivered on programme.
The Problem
No BIM execution standard. FM requirements being retrofitted after construction — expensive and incomplete.
What We Did
Full execution plan at Day 1. Model built to LOD 500 with FM integrated from the start.
The Result
First hospital in Doha with full BIM + FM integration. Future expansions planned inside the model.
The Problem
Subs working to different standards. Field teams frustrated. Coordination meetings with no follow-through.
What We Did
One unified process. One model. One standard — updated continuously from both site and remote coordination.
The Result
Clashes resolved before installation. Sub confidence sustained throughout. Zero field coordination failures.
Excelize helped us by truly partnering — integrating BIM into our preconstruction process in a way that's actually stuck.
21 years of working together. We continue to develop tools and strategies for enhanced productivity because the results have been consistent.
Excelize has been a strong partner in achieving our goals of leveraging BIM technology for maximum benefit to our clients.
The calculator gives you a number based on patterns. But your projects have specific details that patterns can't fully capture.
In 30 minutes, we'll look at your actual active projects, run the real numbers, and hand you a written action plan, specific to your team, your project types, your exact situation.
We do this because understanding what's happening inside preconstruction matters to us. If something useful comes out of it for you, that's enough. The report is yours regardless.
We run your real numbers on your actual active projects, not industry benchmarks
We tell you honestly what's strong and where the gaps are, not what you want to hear
Written Coordination Risk Report within 24 hours, ranked by dollar impact, yours to keep
We do these sessions because understanding what happens inside preconstruction matters to us — not as a step toward something.
Book Your Free Assessment →Max 8 sessions per month — so every one gets full attention.
We'd rather answer these here than have them stand between you and something genuinely useful.
Yes. The calculator is free, no email required. The 30-minute assessment is free. If we think we can genuinely help further, we'll say so once, simply. That's it.
Good, the calculator is even more valuable then. Teams with strong processes still find 1–2 meaningful gaps they hadn't seen. A strong process has less tolerance for hidden leaks.
No. We're here to help you see your own process clearly. Some of what we find, you'll fix entirely on your own, and we'll tell you that honestly.
A specialist BIM coordination firm, 21 years, 2,500+ projects, ISO 19650 certified. We work with GCs and Contractors across the USA, UK, and Middle East. We've seen what coordination failures cost. That's why we built this.
Your projects deserve better margins. Your team deserves less fire-fighting. Start by knowing exactly what coordination is costing you — right now.
Free. No email. No sign-up. No commitment.
We built this because we care about what happens inside preconstruction.
We hope it gives you something useful — whatever you decide to do with it.
— The Excelize Team