You're Losing Money on Every Project. You just don't know exactly how much.

Coordination problems bleed your budget silently, buried inside change orders, rework, and delays that look like "normal project costs." This free calculator shows you the real number in 2 minutes.

Free. No email required. No sign-up. Two minutes.

21yrs
BIM Experience
2,500+
Projects Delivered
300+
GCs Helped
Excelize Work Anniversary
The Silent Problem

Coordination problems don't look like problems.
They look like normal costs.

Every week, your projects absorb small losses that nobody traces back to the real cause. They get called "project complexity." They get filed under "design changes." They become the new normal.

The real cause is a coordination gap, happening before the field ever sees the model.

"We assumed rework was just part of the process. We didn't know it had a number."

Where Your Budget Is Going — Right Now
🔧
Field rework after model handoff ~2–4% of project
📋
Emergency design changes during construction ~1–3% of project
Schedule delays from unresolved clashes ~1–2 weeks
💸
Sub-contractor disputes over model quality Variable
Your annual exposure Take the calculator →

"We've worked on 2,500+ projects across 21 years. Coordination failures always cost more than they appear, and they always show up in the same places. We built this calculator because you deserve to see your number before it's too late to change it."

21yrs
Experience
2,500+
Projects
ISO 19650
Certified
Your 3-Step Path to Clarity

See your number in 2 minutes.

No technical data. No preparation. Answer to three simple questions you already know.

01
30 seconds
Tell us your project size

One number. Your typical project value. That's all we need to scale your result to your reality, not a generic average.

02
60 seconds
Answer 7 honest questions

About your last 3 projects. What happened on site. No right or wrong answers, just your honest experience.

03
Instantly
See your exposure number

A specific dollar estimate plus 3 actions you can take this week, no consultant needed, no BIM team required.

No sign-up. No email. No commitment. You see your number and you keep it. That's the whole transaction.

Two Futures

What changes when you can see the real number.

Right Now — Without Clarity
Rework gets absorbed into project cost, you don't know the real source
Change orders feel unavoidable, not like a fixable process problem
Margin leaks silently, by the time it's visible, it's already gone
Every project carries a cost you can't name, can't measure, can't fix
After the Calculator — With Clarity
You know exactly what coordination is costing you — in dollars, this year
You have 3 specific fixes — ranked by dollar impact, ready to act on this week
You deliver projects cleaner — less rework, less fire-fighting, less stress
You protect your margin — before it bleeds, not after
Real Projects. Real Results.

What other GCs found — when they finally looked.

InfrastructureInternational AirportMulti-discipline

The Problem

Clashes found after design was locked. Coordination meetings happening but not following through to field.

What We Did

Unified coordination gate across all disciplines. Single model standard before any field handoff.

The Result

Zero structural clashes during construction. Delivered on programme.

HealthcareSuper-Specialty HospitalDoha, Qatar

The Problem

No BIM execution standard. FM requirements being retrofitted after construction — expensive and incomplete.

What We Did

Full execution plan at Day 1. Model built to LOD 500 with FM integrated from the start.

The Result

First hospital in Doha with full BIM + FM integration. Future expansions planned inside the model.

CommercialHigh-Rise ResidentialDesign-Build

The Problem

Subs working to different standards. Field teams frustrated. Coordination meetings with no follow-through.

What We Did

One unified process. One model. One standard — updated continuously from both site and remote coordination.

The Result

Clashes resolved before installation. Sub confidence sustained throughout. Zero field coordination failures.

"

Excelize helped us by truly partnering — integrating BIM into our preconstruction process in a way that's actually stuck.

Nicholas Howard
Chief Operating Officer
"

21 years of working together. We continue to develop tools and strategies for enhanced productivity because the results have been consistent.

Ronald Jones
Co-Founder, HHJA
"

Excelize has been a strong partner in achieving our goals of leveraging BIM technology for maximum benefit to our clients.

Steven Elsdon
President, Unistrut
If You Want to Go Deeper
What if you could see your exact exposure — not an estimate — in 30 minutes?

The calculator gives you a number based on patterns. But your projects have specific details that patterns can't fully capture.

In 30 minutes, we'll look at your actual active projects, run the real numbers, and hand you a written action plan, specific to your team, your project types, your exact situation.

We do this because understanding what's happening inside preconstruction matters to us. If something useful comes out of it for you, that's enough. The report is yours regardless.

Free Working Session
The Coordination
Risk Assessment

We run your real numbers on your actual active projects, not industry benchmarks

We tell you honestly what's strong and where the gaps are, not what you want to hear

Written Coordination Risk Report within 24 hours, ranked by dollar impact, yours to keep

Your Investment30 minutes + honest answers

We do these sessions because understanding what happens inside preconstruction matters to us — not as a step toward something.

Book Your Free Assessment

Max 8 sessions per month — so every one gets full attention.

Quick Answers

Things you might
be wondering.

We'd rather answer these here than have them stand between you and something genuinely useful.

Yes. The calculator is free, no email required. The 30-minute assessment is free. If we think we can genuinely help further, we'll say so once, simply. That's it.

Good, the calculator is even more valuable then. Teams with strong processes still find 1–2 meaningful gaps they hadn't seen. A strong process has less tolerance for hidden leaks.

No. We're here to help you see your own process clearly. Some of what we find, you'll fix entirely on your own, and we'll tell you that honestly.

A specialist BIM coordination firm, 21 years, 2,500+ projects, ISO 19650 certified. We work with GCs and Contractors across the USA, UK, and Middle East. We've seen what coordination failures cost. That's why we built this.

You Have Everything You Need

Two minutes. Your number.
Total clarity.

Your projects deserve better margins. Your team deserves less fire-fighting. Start by knowing exactly what coordination is costing you — right now.

Free. No email. No sign-up. No commitment.

We built this because we care about what happens inside preconstruction.
We hope it gives you something useful — whatever you decide to do with it.
— The Excelize Team