Get a Quote

Work With Us

Grow into a career. Grow as a person. Give us the attitude to learn and we shall give you the skills to deliver.


Our US office is located in Chesterfield, NJ. We have our presence in UK & MENA region as well. Our operations center is located at Software Technology Park, Chikalthana Industrial Area, Aurangabad, India.

"It is easy to understand our strengths by tracking our results. Yet most of us underestimate our own strengths. We take them for granted".
-Peter Drucker

  • We believe that the success of our business is based on the talent and commitment of our people.
  • We nurture our people and provide them opportunities for their growth and development.
  • We encourage diversity and respect for all, irrespective of their position
  • Our appraisal system is transparent and fair.
  • Our high-performance culture has made it possible for us to be here today.
  • Our global footprint makes it an Employer of First Choice.
If you like challenges and aspire to make a difference, send us your resume at jobs@excelize.com
USA based BIM Project Coordinator
Location: California, USA
Qualification:
  • Bachelors in Civil Engineering or Bachelors in Architecture
  • Masters in Construction Management, Civil Engineering or Mechanical Engineering preferred
  • Minimum of 2 years of BIM Experience
  • Must have work authorization in US. Company may consider applying appropriate work visa in certain cases.
Responsibilities:
  • Revit Architectural, Structural, MEPF modeling.
  • Lead BIM Coordination using Navisworks Manage and Glue.
  • Working & coordinating between remote teams in Excelize office and clients in the US.
  • Set project schedules and manage multiple projects concurrently.
  • Monitor project deliverables & pdate relevant stakeholders and team members on project progress.
  • Knowing when and how to get the information necessary to complete each task.
  • Writing proposals and estimates for various projects.
  • Assist Sales Team by participating in sales presentations and conference calls.
Project Manager Design (International Projects)
Location: Aurangabad India
Qualification:
  • BE Mechanical from reputed university
  • Masters (or foreign equivalent) in Mechanical Engineering or Construction Management from reputed university.
Responsibilities:
  • The Project Manager is directly responsible for scheduling all phases of a project, the technical specifications necessary to acquire equipment and materials.
  • Work cooperatively and collaboratively with existing team of designers and engineers to follow through with tasks and recommend solutions for project designs.
  • Mentoring of staff, perform periodic model review.
  • Coordinate and trouble shoot technical items with clients, consultants and other departments.
  • A strong sense of urgency and initiative. Able to quickly study and react to complex issues.
  • Excellent problem-solving skills and the ability to confidently and decisively take action.
  • This position will perform the engineering, design and commissioning of equipment.
  • Ability to manage multiple design projects at a time.
  • Exposure and working knowledge of Revit.
  • 3+ years of project management experience.
BIM Project Manager (International Projects)
Location: Aurangabad India
Qualification:
  • B.E. Civil or B.Arch from a reputed Institute in India
  • M.S. in Construction Management or M.S. in Civil Engineering from reputed Institute in India
  • Minimum of 6 years of BIM Experience
  • Experience working on international projects is required
Responsibilities:
  • Revit Architectural, Structural, MEP, and MF modeling.
  • Lead BIM Coordination using Navisworks Manage and Glue.
  • Working on teams in Excelize office and on project sites or client offices.
  • Set project schedules and manage multiple projects concurrently.
  • Monitor project deliverables and prioritize effectively in a fast-paced environment.
  • Update relevant stakeholders and team members on project progress.
  • Mentor and support project team members.
  • Quality Checking of your work and others work.
  • Knowing when and how to get the information necessary to complete each task.
  • Writing proposals and estimates for various global projects.
  • Assist Sales Team by participating in sales presentations and conference calls.
  • Attend and present at AEC industry user groups and conferences.
BIM Engineer (International Projects)
Location: Aurangabad India
Qualification:
  • BE / BTECH- Graduate Engineer only from premier Institutes like IITs.
  • Minimum of
  • - 2 years of BIM Experience
  • Experience working on international projects is required
  • Self-motivated, able to follow direction, able to work well on a team.
Responsibilities:
  • Revit Architectural, Structural, MEP, and MF modeling.
  • As-built modeling from point clouds.
  • Support BIM Coordination using Navisworks Manage and Glue.
  • Working on teams in Excelize office and on project sites or client offices.
  • Meeting project deadlines in a fast-paced environment.
  • Quality Checking of your work.
  • Reporting to Project Manager
BIM Project Manager/ Project Coordinator (for Southern California Office)
We require someone who has a valid work permit in the US.
Qualification:
  • Bachelors in Civil Engineering or Bachelors in Architecture
  • Masters in Construction Management, Civil Engineering or Mechanical Engineering preferred
  • Minimum of 5 years of overall experience in the AEC industry
  • Minimum of 2 years of experience in BIM
Responsibilities:
  • Revit Architectural, Structural, MEPF modeling.
  • Lead BIM Coordination using Navisworks Manage and Glue.
  • Working & coordinating between remote teams in Excelize office and clients in the US.
  • Set project schedules and manage multiple projects concurrently.
  • Monitor project deliverables & update relevant stakeholders and team members on project progress.
  • Knowing when and how to get the information necessary to complete each task.
  • Writing proposals and estimates for various projects.
  • Assist Sales Team by participating in sales presentations and conference calls.
Business Development Manager-Overseas Sales
Qualification:
  • Civil / Architect Engineering and
  • MBA Sales & Marketing.
  • High competency working with Microsoft Office
  • Knowledge of CRM software
Responsibilities:
  • Business Development for US market
  • Managing Accounts for US market
  • Develop and manage customers / assigned partner across assigned territories.
  • Acquiring new clients/customers and actively participating in the sales cycle.
  • Open to travel all Domestic and International locations as and when required.
  • Build, sustain and grow a productive working, and revenue generating relationship with the assigned Customers.
  • Establish relations among the corporate companies / different trade bodies etc.
  • Meet the targets for sustainable revenue growth.
Contribute to the development of accurate forecasts and budgets..
Project Leader / Manager (Structural Design )
Location: Aurangabad, India
Qualification:
  • B.Tech/B.E. (Civil), M.Tech in Structural Designing (Civil)
Software knowledge:
  • AutoCAD
  • REVIT
  • Rebar Detailing
  • Steel Detaining
  • RC CAD
  • cads RC
  • Tekla
  • Precast Detailing
Experience:
  • 3-6 years of experience as Civil Design Engineer in a leading company and having experience in designing and thorough knowledge of all the design codes.
  • Experienced in design based on manual as well as using appropriate design software.
  • Should have enough experience in handling Major Projects.
  • Should possess good interpersonal skills to liaise with clients, contractors and all associated parties.
Overseas Project experience is a MUST.
Responsibilities:
  • Preparation of shop drawing, fabrication drawing,BBS & MTO
  • Design and Detailing of Process Plants, Buildings, Sewage Treatment Plants, Roads & other Infrastructure.
  • Analyzing configurations of the basic structural components of roads, highways, bridges, canals or other structure as per contractual requirements.
  • Bar bending schedules, Quantity take off
  • Design and Detailing of Foundations for various Process Equipment, Storage Tanks, Operating Platforms, UG / AG Concrete Tanks / Pits, Storm Water Drainage, etc.
  • Design and Detailing of Pipe Racks in RCC & Structural Steel.
  • Preparation of Civil & Structural Project Specifications for RCC & Steel.
  • Preparation of Design Data, Design Basis, Design Calculations & Design instructions for Projects.
  • Coordination with Client / Site to study site queries / difficulties, finding solution for the same.
  • Structural designing and analysis of calculations using governing codes and standards.
  • Providing construction drawings based on design.
Email Subscription
Global Locations
Follow Us On
Copyright © 2020 Excelize All Rights Reserved. | Privacy Policy