Free · No Cost · No Contract

See What's Hiding In Your Model

Send us one project model. We scan it for clashes and send back a clear report in 5 days — no cost, no contract.

5 DaysTurnaround on your report
142Avg. clashes found per scan
$0Cost, zero obligation
See what one missed clash can cost
Free sample: no cost, no contract How it works

Clashes Don't Get Cheaper by Waiting.

$500 $50,000

Design Development fix vs. the same clash found on site

$31.3B

Uncoordinated systems cost the industry an estimated $31.3B in rework every year — and every dollar of it was avoidable earlier in the model.

Source: Autodesk / FMI

We know finding time for a rigorous, second-set-of-eyes coordination pass on top of live project deadlines is nearly impossible for most internal BIM teams.

21+ Years In BIM production
2,500+ Projects delivered
300+ Clients

How It Works

Three steps. Five business days.

1

Share Your Model

Share one project model — current or recently completed — plus a 15-minute kickoff call on your priorities. No cost, no contract to start.

2

We Run the Scan

We run the full clash and coordination scan, free of charge. 5 business days, start to finish.

3

Readout Call

A 30-minute readout call walking through the findings — no sales deck, just the results.

Case Studies

Coordination work we've actually delivered.

Real projects where a second coordination pass caught what the field would have.

Real challenges. Real solutions. Real results.

See how we help leading firms overcome BIM challenges and deliver with confidence.

01
Challenge

Solution

Result

Without This

Here's What Stays the Same.

Clashes keep surfacing in the field instead of the model. Change orders keep eating the schedule. And the same conversation happens on every project: whose model missed it.

Clashes surface in the field, not the model
Change orders keep eating the schedule
Same conversation every project: whose model missed it

With This

Walk Into Construction Knowing What's Already Been Checked.

A second, senior set of eyes has already been through the model — so the clashes that would've surfaced in the field get fixed on paper, for free, before they cost anyone anything.

At a Glance

Here's exactly what you're signing up for.

Your Free Health Check

100% Free
Investment $0, fully complimentary
Turnaround 5 business days
Your Time ~45 minutes total
Scope One project, one coordination pass
Obligation None

Frequently Asked Questions

No — this is a one-time coordination review. Your team stays in control.

One project model, access to relevant discipline models, a 15-minute kickoff call, and 30 minutes for the readout.

Free · No Cost · No Contract

Ready to See What's Hiding In Your Model?

One model. Five business days. Zero cost, zero obligation.

A complete clash and coordination scan of one project model
A clear, ranked report — by discipline and severity
A 30-minute readout call — no sales deck, just results

Prefer to talk first? Contact an expert.

Claim Your Free Health Check

Share one project model — a BIM lead replies, not a general inbox.

1
2






    100% Secure
    5-Day Turnaround
    No Obligation