BIM Services
Concept to fabrication — coordinated Revit models, clash-free federated files and drawing sets your field crews can build from.
All services
BIM Consulting
Standards, workflows and ISO 19650 processes that make BIM repeatable across every project your firm takes on.
All services
Staffing & Design Support
Trained modelers and engineers working in your time zone, to your standards — scale up in days, not hiring cycles.
BIM Staffing
Design Support
BIM insights, how-tos and industry deep dives for AEC teams.
Free downloadable guides for precon, VDC and BIM leaders.
Monthly BIM insights and project lessons in your inbox.
ROI Calculator and ISO 19650 readiness checklist.
Real projects with results in numbers, across five verticals.
Model demos and project explainers.
Step-by-step model and project walkthroughs.
What Is BIM Coordination? Clash Detection, LOD, and the Federated Model Explained
In-House BIM Team vs Outsourcing: What It Actually Costs a U.S. Firm
ISO 19650 Explained: What U.S. AEC Firms Need to Know Before Their Next Bid
Read more40-Story Office Tower, Dallas — 12 Trades Coordinated Clash-Free
420,000 sq ft of Class A commercial delivered at LOD 350 — full coordination, clash resolution and model-linked quantity takeoffs across every discipline.
Get to know how, since 2004, Excelize grew into the BIM partner U.S. AEC firms trust — 300+ clients served and 2,500+ projects delivered end to end.
Learn MoreWho We Are
How We Work
Trust
Careers
Not a sales call. A 30-minute working session with a BIM lead, scoped to your role, before you commit to anything.
Every Discovery Session is run by someone who can actually answer coordination questions, not a rep reading from a script. You leave with a real answer, not a follow-up email promising one.
Tell us about the project — a BIM lead replies, not a general inbox.
A BIM lead will get back to you within one business day to set up your 30-minute session.
















If you’re a
We’ll walk through your project’s bid timeline and where BIM coordination protects your margin — specifically, whether a 5D QTO can realistically turn around inside your bidding window, and what a late-caught clash on your project type would actually cost you.
Find Your 30-Minute Slot
If you’re an
We’ll talk through where your design intent needs to hand off into coordinated MEPF work, and how that handoff is managed so your design documentation and the coordinated model stay aligned through Construction Documents.
Find Your 30-Minute Slot
If you’re an
We’ll discuss where your in-house coordination capacity is getting stretched — whether that’s peak Design Development load or a project type your team hasn’t scaled for yet — and what extending that capacity would actually look like on your next project.
Find Your 30-Minute Slot
If you’re a
We’ll look at what’s required to win the coordinated shop drawing packages GCs are increasingly making a condition of the bid, and whether your current process can produce them — or where the gap is.
Find Your 30-Minute SlotBuilding type, stage, and what’s actually at stake — schedule, bid, or a specific technical problem.
If Excelize isn’t the right match for your scope, you’ll hear that on the call, not after a proposal cycle.
LOD requirements, realistic timeline, what a coordinated engagement would look like for your specific building type.
No proposal gets sent without this conversation happening first. That’s deliberate — a scope built without understanding your actual constraint is a guess, not a plan.
22+ years across commercial, multifamily, healthcare, hospitality, datacenter, industrial, and infrastructure work.
Offices in New Jersey and California, a dedicated BIM studio in Aurangabad, and project experience across TX, FL, NY, NJ, CA and PA.
Insurance certificates, MSA terms, and process references available as part of your qualification process — before or after the call.
Coordination workflows aligned with recognised information-management principles — a practised way of working, applied on every engagement.
Send us a sample scope and we’ll turn around a small piece of work, so you can judge the quality against your own standards before any conversation about a larger engagement. Prefer email? Reach us directly and a BIM lead will respond.