Excelize
Company
Story
Excelize team

Get to know how, since 2004, Excelize grew into the BIM partner U.S. AEC firms trust — 300+ clients served and 2,500+ projects delivered end to end.

Learn More
Book a Consultation

3D BIM Modeling Services in the USA

We build architectural, structural, and MEP models in Revit, at the level of detail your project needs. Accurate, coordinated, and modeled to your standards.

Whether you need a single discipline or a full federated model, Excelize runs as your extended modeling team. We work in your Revit templates and to your standards, so the model drops straight into your workflow.

2004Building BIM since
Revit · TeklaModeled in
LOD 100–500Level of detail
2,500+Projects
Explore our BIM services
One partner for every discipline What we deliver
What It Is

What is 3D BIM modeling?

3D BIM modeling turns 2D drawings or design intent into an intelligent 3D model. Each element carries geometry and data, so the model can be coordinated, quantified, and built from. Excelize models architectural, structural, and MEP disciplines in Revit, from LOD 100 concept models to LOD 500 as-built models, for U.S. architects, engineers, and contractors.

What We Deliver

What our 3D BIM modeling service includes

Architectural BIM

Walls, floors, roofs, openings, and finishes modeled from your design through construction documents.

Structural BIM

Concrete, steel, and framing modeled in Revit or Tekla, coordinated with architecture and MEP.

MEP BIM

Mechanical, electrical, plumbing, and fire-protection systems modeled as working, coordinated systems.

LOD 100 to 500

Modeled to the detail your phase needs, on AIA G202 and BIMForum definitions.

Families and templates

Built to your standards so the model stays consistent across the team.

Coordinated and QA-checked

Every model checked for integrity and clash-readiness before handoff.

Our Process

Our 3D BIM modeling process

01

Inputs and standards

We confirm your drawings, BEP, templates, and target LOD.

02

Modeling

Discipline modeling in Revit, with internal QA at each milestone.

03

Coordination check

We federate and check for integrity and clashes before delivery.

04

QA and sign-off

Senior review against your standards and the brief.

05

Handoff and support

Delivery in your formats, with a window for revisions.

Tools & Standards

3D BIM modeling tools and standards we use

01

Software

Revit and Tekla, with Navisworks for coordination, inside ACC, BIM 360, or your CDE.

02

Standards

AIA G202 and BIMForum LOD, your BEP, templates, and U.S. codes.

03

Disciplines

Architectural, structural, mechanical, electrical, plumbing, and fire protection.

04

Formats

RVT, IFC, NWC, and DWG.

Where We Apply It

3D BIM modeling by building type

Built for the U.S. project types where modeling carries the schedule:

Commercial and mixed-use

Commercial and mixed-use

Repetitive cores and tight CD deadlines, modeled to your standards.

OfficeRetailMixed-use towers
Healthcare and labs

Healthcare and labs

Code-heavy, system-dense buildings modeled and coordinated to high LOD.

HospitalsLabsHigh LOD
Residential and multifamily

Residential and multifamily

Unit-type libraries and high sheet counts, modeled for consistency.

Mission-criticalFabrication-ready
Renovation and retrofit

Renovation and retrofit

Existing buildings modeled from scan or record data into accurate models.

InstitutionsPublic ownersMulti-phase

Send us a drawing set. Get a model back.

Share a set or a sketch. We will model a sample in Revit to your standards in 2 to 3 days, so you can see the quality before you commit.

Why It Matters

The ROI of accurate BIM modeling

An accurate model is the foundation on which every other BIM service stands. Rework from bad data costs the U.S. construction industry an estimated $31.3 billion a year, and most of it starts with an inaccurate model. A clean model coordinated to LOD 350 keeps RFIs down and your team reviewing, not rebuilding.

$31.3Bannual U.S. rework
LOD 100–500modeling range
Revit & Teklamodeled in

How to work with our BIM modeling team

Free Sample First

Send a real U.S. set or model. We model a sample to your standards in 2 to 3 days.

Get a Free Sample →

Project-Based

A defined scope and fixed deliverables, modeled to your BEP and LOD.

Scope a Project →

Pricing is scoped to the work, by the project or by the month. No long-term lock-in.

Why Excelize

Why choose Excelize for 3D BIM modeling

Since 2004

2,500+ projects across architectural, structural, MEP, and fabrication BIM.

U.S. offices, U.S. standards

Real offices in New Jersey and California, aligned to AIA G202 and BIMForum LOD.

Every discipline in-house

Architecture, structure, and MEP under one roof, modeled to coordinate.

Yours to keep

We work under NDA; every model and family is delivered to you.

You own the outcome. We own the production.

Since 2004Building BIM
2,500+Projects delivered
300+Clients
48 hoursTo embed with your team
Related Resources

FAQs

3D BIM modeling FAQs

Still have questions? Talk to a BIM Lead
It is the process of turning 2D drawings or design intent into an intelligent 3D model whose elements carry geometry and data, so the model can be coordinated, quantified, and built from.
Revit and Tekla, with Navisworks for coordination, inside Autodesk Construction Cloud or BIM 360. We deliver in RVT, IFC, NWC, and DWG.
From LOD 100 concept models through LOD 500 as-built models, using AIA G202 and BIMForum definitions, to the level your phase requires.
Yes. We model from drawings, sketches, CAD files, or point cloud scan data.
Yes, architectural, structural, mechanical, electrical, plumbing, and fire protection, modeled to coordinate.
A modeler or pod can be embedded within 48 hours, and productive in the first week.
Yes. We work under NDA, and every model and family is delivered to you.

Send us a drawing set. See the model quality first.

Share a set or a sketch, and we will model a sample in Revit to your standards in 2 to 3 days, so you can judge the work before you commit.

  • No contract
  • No obligation
  • Your work and your IP stay yours