Excelize
Company
Story
Excelize team

Get to know how, since 2004, Excelize grew into the BIM partner U.S. AEC firms trust — 300+ clients served and 2,500+ projects delivered end to end.

Learn More
Book a Consultation
BIM Delivery Models / Dedicated BIM Studio

Your Dedicated BIM Studio: Onshore Standards, Offshore Scale, Live in 7 Days

An embedded BIM team built to U.S. coordination standards, for general contractors and MEPF engineering firms who need capacity without adding headcount.

Most BIM capacity problems aren't solved by hiring, and they aren't solved by handing a project to a modeling shop on a one-off basis either. Hire, and fixed payroll runs through the slow months. Outsource project by project, and standards get re-explained every time. A dedicated BIM Studio is a third option: an embedded team inside your workflow, at a fixed cost, live within a week.

ISO 19650Aligned workflows
2004Building BIM since
2,500+BIM projects delivered
NJ & CANew Jersey & California, USA
The Capacity Problem

Why in-house BIM capacity breaks under real project load

A general contractor or MEPF firm's BIM demand doesn't move in a straight line. It spikes at Bidding, spikes again at Design Development, and goes quiet between awards. An in-house team sized for the busy months sits underutilized in the slow ones. Sized for the slow months, it can't absorb the spike without falling behind on RFI turnaround at the exact moment the schedule is tightest.

Project-based outsourcing solves the sizing problem but creates a different one. Every new engagement starts from zero. A new team has to learn your templates, your QA/QC checkpoints, and your communication cadence from scratch, on every project.

A Dedicated BIM Studio avoids both failure modes. Fixed monthly cost like an in-house hire. Ramp speed like an outsourced engagement. A team that retains your standards across projects instead of relearning them each time.

The Model

What a Dedicated BIM Studio actually is

A dedicated team, not a project queue

The same modelers, coordinators, and QA/QC lead work your projects consistently, not rotated engagement to engagement.

Fixed monthly cost

Studio capacity is priced as a predictable monthly commitment, not billed project by project.

Your standards, retained

Templates, BIM Execution Plan conventions, and review checkpoints are set once at studio setup and carried forward on every project.

Direct integration into your workflow

The studio team works inside your existing project management and communication tools, reporting into your process rather than running a separate one.

Consistency across projects

The same team, the same standards, and the same QA/QC checkpoints on every project mean quality doesn't drift depending on who's handling this week's job.

Standing Capability

Design and build virtually with your Dedicated BIM Studio

Your doorway to embedded BIM capacity, built for how GCs and MEPF firms actually work.

Once a studio is live, it does more than absorb project volume. It becomes a standing capability your team can build on.

For General Contractors

Bid, sequence, and hand over from one coordinated model

  • Data-driven bid and schedule decisions

    Dashboard visibility into coordination status across every active bid, not just the one closest to deadline.

  • 4D schedule integration

    The coordinated model ties directly to your project schedule, so sequencing decisions are made against real coordination data.

  • Model-based owner handover

    As-built documentation is ready for turnover at closeout, without a separate closeout modeling effort.

For MEPF Engineering Firms

Validate design and hand over structured data, phase after phase

  • Continuous design validation

    Clash and clearance checks inform system design refinement across every phase, not just a one-time coordination pass.

  • Cross-project template reuse

    Coordination templates and standards built on one project carry forward to the next without rebuilding.

  • Structured facility handover data

    Asset and system data is organized for handover to the owner's facilities management systems at project close.

How It Goes Live

Five steps to Dedicated BIM Studio readiness in 7 days

1
Day 1

Scope and Discovery Session

Define project types, software stack, and required standards.

2
Days 2–3

Team assembly

Modelers, coordinator, and QA/QC lead are onboarded to your templates and BIM Execution Plan.

3
Days 4–5

Pilot task and calibration

The team runs a scoped pilot deliverable against your actual project data.

4
Day 6

Communication protocol confirmed

Review cadence, escalation path, and reporting format locked in.

5
Day 7

Studio goes live

Full production begins on your active project queue.

Engagements

Dedicated BIM Studio engagements for GCs and MEPF firms

Studio engagements are scoped around your project pipeline, not a single deliverable. Team size adjusts as active project volume changes.

General contractors

Typically use a studio for consistent 5D QTO and coordination support across concurrent bids.

MEPF engineering firms

Typically use one to extend in-house coordination capacity during peak Design Development load, without hiring for a demand curve that won't hold through the year.

A scoped pilot task, run against your own project data, is available now through the Free Sample offer above.

FAQs

Dedicated BIM Studio: common questions for GCs and MEPF firms

For questions on data handling, ISO 19650 alignment, or getting started with a sample project, see our Industries FAQ

Still have questions? Book a Discovery Session
Scoped during the Discovery Session based on your project volume and team size needs.
A studio team is dedicated and continuous. It retains your templates and standards across every project. Project-based engagements start fresh each time.
Yes. Team size adjusts to match active project load, the core advantage over a fixed in-house hire sized for peak demand.
A QA/QC lead is part of the studio team, running the same checkpoint structure used across all Excelize engagements.
Typically seven days from Discovery Session to full production. Complex software stacks or template requirements can extend this slightly.
Insurance certificates, MSA terms, and process references are available on request as part of your onboarding process.
Scaling and pause provisions are set out in the MSA agreed at kickoff.

Get your Dedicated BIM Studio live in seven days.

A hired team costs you in the slow months. A new outsourced team costs you in ramp-up time on every project. A dedicated studio is built to avoid both.

  • Live in 7 days
  • Fixed monthly cost
  • Your standards, retained