Get Your Free BIM Plan in 48 Hours 127 plans delivered this month Book Now
EXCELIZE
Think Lean Prefab Systems - Revit Content Creation

Recently, we worked on a very interesting project. A provider of prefabricated solutions for Cleanrooms, Cold Chain Infrastructure, and Engineering products faced unforeseen challenges during assembly. There was a lot… Recently, we worked on a very interesting project.



A provider of prefabricated solutions for Cleanrooms, Cold Chain Infrastructure, and Engineering products faced unforeseen challenges during assembly.

There was a lot of material waste, long installation time, and the risk of prefabricated parts not fitting together.



We put our expertise in BIM to use for creating Revit content (BIM objects) for their prefabricated products.

These would be used by their design team and shared with external agencies for BIM Modelling as well as generating exact BOQs - leading to an efficient prefabrication workflow.



Check out the project Case Study below and connect with us for similar requirements at marketing@excelize.com
Read more Read less

Using BIM Model to Produce 2D Shop Drawings for A Greenfield Institutional Project

Large institutional projects come with a unique set of challenges! More often, they require a reliable partner adept at dealing with multiple consultancies, identifying issues in design models, and ensuring… Large institutional projects come with a unique set of challenges! More often, they require a reliable partner adept at dealing with multiple consultancies, identifying issues in design models, and ensuring the effective use of the BIM coordination platforms and other BIM tools.

Recently we had the opportunity to work with a UK-based consultancy on such a project. We generated BIM models, extracted 2D documentation from the models that meets their custom drawing standards, and helped them accelerate their design phase. They weren't just happy; they were thrilled with how it impacted the project's overall efficiency, speed, and execution.

Check out the project Case Study below and connect with us for similar requirements at marketing@excelize.com
Read more Read less

Design Support Services, BIM Modelling and Project co-Ordination Through a Flexible, Studio Model

With Virtual Design & Construction in conjunction with BIM we can execute multidisciplinary projects across geographies with ease. Here's a case study that proves our point. If you wish to… With Virtual Design & Construction in conjunction with BIM we can execute multidisciplinary projects across geographies with ease.

Here's a case study that proves our point.

If you wish to optimize your construction projects leveraging our BIM expertise, please connect with us at marketing@excelize.com
Read more Read less

MEP Designing Through Flexible Studio Model

Did you know that we need not be in the same country, time zone, or continent to help you streamline & accentuate your construction model? Here's a glimpse of what… Did you know that we need not be in the same country, time zone, or continent to help you streamline & accentuate your construction model?

Here's a glimpse of what our Flexible Studio Model is capable of.

If you wish to optimize your construction projects leveraging our BIM expertise, please connect with us at marketing@excelize.com
Read more Read less

Logistic and Safety Planning for Commercial Building in Mumbai

Did you know that you can ensure the safety of your workers by simply employing BIM at the site planning stage? Embrace BIM now & take your project to the… Did you know that you can ensure the safety of your workers by simply employing BIM at the site planning stage?

Embrace BIM now & take your project to the next level.
Read more Read less

BIM Modeling for Bhendi Bazar Redevelopment

Excelize is working on the Bhendi Bazar rehab project as a BIM consultant. Approximate area considered for this project is 1,811,373 sq. Excelize is working on the Bhendi Bazar rehab project as a BIM consultant. Approximate area considered for this project is 1,811,373 sq. Read more Read less

Model and Produce Shop Drawings for A Residential Unit USA

The project required a model of LOD 300 level for a residential unit. Client has shared us hand sketches of design as inputs and some documents as a reference to… The project required a model of LOD 300 level for a residential unit. Client has shared us hand sketches of design as inputs and some documents as a reference to model and produce the typology. After the first draft submission we had a brief meeting with the client to understand more on the details he needed. We went to extra mile and provided the client with LOD 350 model of the unit and shop drawings matched to his needs which was appreciated. Read more Read less

Championing the Sustainability Movement Public Park in Qatar.

Spread across 50,000 square meters and serving close to 3000 visitors daily, the park has a one-of-its-kind cooling and air conditioning system used for the jogging tracks to ensure that… Spread across 50,000 square meters and serving close to 3000 visitors daily, the park has a one-of-its-kind cooling and air conditioning system used for the jogging tracks to ensure that pedestrians are comfortable. The Excelize team joined as their exclusive BIM consultant and helped with the complete coordination of the project. This is a great example of how the AEC industry can be sustainability allies while creating noteworthy projects that are profitable and popular. BIM can be a great partner in this quest. Here are the complete details of the project Read more Read less

Asset Management - Super Specialty Hospital Building

The focus of this case study is Asset management of Super Specialty Hospital building. Spread over 77 acres, the project required us to build an as-built BIM model using 2D… The focus of this case study is Asset management of Super Specialty Hospital building. Spread over 77 acres, the project required us to build an as-built BIM model using 2D drawings, add asset tags to architectural and service components, integrating BIM and FM to achieve a LEAN approach for the easy and long-term management of the hospital. The idea was to make the optimum use of time and resources and ensure that all departments like mechanical, electrical, bio medical, IT etc. were able to work in tandem. Read more Read less

BIM Modelling for A Luxury Hotel Renovation and Expansion Project in Mumbai, India

One of the most iconic luxury names in hospitality, this brand was looking to renovate and add additional spaces to their hotel located in Mumbai, India. The project required renovation… One of the most iconic luxury names in hospitality, this brand was looking to renovate and add additional spaces to their hotel located in Mumbai, India. The project required renovation of a ballroom, two restaurants and a meeting room to the hotel. The guest room services transferred from the ceiling of the ballroom (what do we mean?). Due to this it was very critical to have an existing BIM model. The interior design was coordinated and designed using this BIM model. The requirement was for the generation of an existing BIM model that the designers would use to help with the renovation.

If you wish to optimize your construction projects leveraging our BIM expertise, please connect with us at marketing@excelize.com

To know more visit - BIM An Effective Tool for Renovation Projects
Read more Read less

BIM Modelling for A Multinational Retail Coffee Chain

An American, multinational chain of coffee houses and cafes required a BIM model for improved construction coordination for one of their locations in California. Spanning across an area of 2,658… An American, multinational chain of coffee houses and cafes required a BIM model for improved construction coordination for one of their locations in California. Spanning across an area of 2,658 sq. ft, the facility had a set of complex services to offer – including reception lobby and counter, waiting area, and toilets.

If you wish to optimize your construction projects leveraging our BIM expertise, please connect with us at marketing@excelize.com

Read more Read less

BIM Modelling for Designing the Plumbing System for A 4-Storey Residential Apartment

A plumbing design contractor who designed and installed the plumbing system, required BIM Modelling for a residential apartment at Walnut Creek, California, USA. The building comprised of the basement +… A plumbing design contractor who designed and installed the plumbing system, required BIM Modelling for a residential apartment at Walnut Creek, California, USA. The building comprised of the basement + 4 levels of construction spanning across an area of 300,000 sq ft.

Project Requirement:

· To generate 3D model for plumbing as per design input.

· To co-ordinate the plumbing work to be done with other services

· To ensure Clash-free operations

· To create 2D CAD drawing output so that the right components as part of the plumbing system could be installed at site

Excelize Intervention: Timely project delivery, remote co-ordination and assistance with onsite team. The Excelize team served as the one-point BIM team for the contractor.

If you wish to optimize your construction projects leveraging our BIM expertise, please connect with us at marketing@excelize.com
Read more Read less

BIM Modelling for A Manufacturing Unit in India

A global leader in the food coloring sector had to set up a new industrial unit for processing food flavors and fragrances near Pune, India. The site for the new… A global leader in the food coloring sector had to set up a new industrial unit for processing food flavors and fragrances near Pune, India. The site for the new facility is spread over 10 acres, wherein built-up area of the warehouse is 1500 sq metres. The production block is 3 storeys high housing 3 kinds of process areas on all floors.

Key Challenges:

· It was challenging to incorporate new design as RCC structure and brick work was complete on site.

· Fire Escape, Material & Equipment movement and support for co-ordination and Hygiene rules were key parameters.

If you wish to optimize your construction projects leveraging our BIM expertise, please connect with us at marketing@excelize.com
Read more Read less

14-Storey 5-Star Hotel In USA

A 14-storey 5-star hotel in USA, a huge parking space, a retail space at the ground level located at a prominent corner in the city needed BIM support as a… A 14-storey 5-star hotel in USA, a huge parking space, a retail space at the ground level located at a prominent corner in the city needed BIM support as a mixed-use development project. The project covered an area of 484,000 square feet, 247 rooms in the hotel, 25000 sq feet of retail space on the ground floor and a parking structure for 700 vehicles.

Key Challenges:

· It was labelled as a fast-track building, meaning design development would continue while construction was underway

· The team had to conduct frequent rounds of clash detection as they were faced with the pressure of continuous design during construction.

If you wish to optimize your construction projects leveraging our BIM expertise, please connect with us at marketing@excelize.com
Read more Read less

BIM Modelling for A Mixed Use Building

A Mixed-Use project where BIM was implemented through Schematic Design, Detail Design, GFC and as built stage. The project spanned an area of 16,35,000 sq. feet. with services apartments over… A Mixed-Use project where BIM was implemented through Schematic Design, Detail Design, GFC and as built stage. The project spanned an area of 16,35,000 sq. feet. with services apartments over 11 floors and office over 10 floors and multiple basements If you wish to optimize your construction projects leveraging our BIM expertise, please connect with us at marketing@excelize.com Read more Read less

BIM Modelling for A Site Infrastructure Development Project in Florida, USA

A 2,52,000 sq feet site infrastructure development project by a Florida-based construction group required a co-ordinated BIM model of all existing as well as proposed underground utilities on the site.… A 2,52,000 sq feet site infrastructure development project by a Florida-based construction group required a co-ordinated BIM model of all existing as well as proposed underground utilities on the site. In addition to the site utilities, the hardscape, sidewalk etc was also to be modelled.



If you wish to optimize your construction projects leveraging our BIM expertise, please connect with us at marketing@excelize.com
Read more Read less

BIM Modelling for Designing a Luxury Mixed Use Community with Commercial and Residential Amenities

A mixed use project in Doha, Qatar comprising of residential towers, clubhouse, community spaces, mosque, beach front villas, etc presented complexities in coordination and thus required BIM models for an… A mixed use project in Doha, Qatar comprising of residential towers, clubhouse, community spaces, mosque, beach front villas, etc presented complexities in coordination and thus required BIM models for an area spanning 70,966 sq meters. The project includes buildings and landscaping, entertainment and mixed-use (retail/residential) facilities. The project comprises of basement, podium and multiple towers along with villas and other independent structures.

Project Requirements:
· Validation and Updation of LOD-300 model as per IFC drawings for any conflict.
· Clash Coordination and Resolution
· Upgrading the design model to an LOD 400 construction model
· 4D Simulation for Architectural & Structural services
· Extraction of 2D drawing from the model
· Generation of LOD 500 As-built model
· Asset Tagging for Facilities Management

Key Challenges:
· Received Input model does not meet the requirements of LOD 300 level. Besides this there are significant design changes of the MEPF layout drawings
· Biggest challenge was getting clearances in driveway and parking are for HVAC and plumbing services
· Managing the work with work on clash coordination happening simultaneously along with installation at site

Excelize Intervention:
· Co-ordinated BIM model helped onsite installation without interference with the existing installations.
· Delivery of timing coordinated BIM models leading to higher confidence in client teams wrt BIM
· Pro-active support, seamless project co-ordination and ease of communication made way for a long-term relationship with the customer.
Read more Read less

BIM Modelling for Designing the Plumbing System for A 4-Storey Residential Apartment

A plumbing design contractor who designed and installed the plumbing system, required BIM Modelling for a residential apartment on the west coast, USA. The building comprised of the basement +… A plumbing design contractor who designed and installed the plumbing system, required BIM Modelling for a residential apartment on the west coast, USA. The building comprised of the basement + 4 levels of construction spanning across an area of 300,000 sq ft.

Project Requirement:

To generate 3D model for plumbing as per design input.
To co-ordinate the plumbing work to be done with other services
To ensure Clash-free operations
To create 2D CAD drawing output so that the right components as part of the plumbing system could be installed at site

Excelize Intervention: Timely project delivery, remote co-ordination and assistance with onsite team. The Excelize team served as the one-point BIM team for the contractor.
Read more Read less

Creation Of 3D BIM model for Infrastructure Construction in An Island City in Qatar

A luxury island in the greenfield city of Lusail, Qatar is being developed. Infrastructure and landscaping are being done over an area 50 square kilometers. The development includes the construction… A luxury island in the greenfield city of Lusail, Qatar is being developed. Infrastructure and landscaping are being done over an area 50 square kilometers. The development includes the construction of roads, fueling pier, all wet and dry utilities on the islands. The work incorporated all services including, but not limited to power, IT, Telecom, wet and dry utilities, landscape, signage, roadway lighting, traffic signals and gas networks. Read more Read less

Scan To BIM Heritage Building

Excelize has worked as a BIM Consultant to provide Scan to BIM services for a heritage building which is more than 60 years old. This building is due for renovation… Excelize has worked as a BIM Consultant to provide Scan to BIM services for a heritage building which is more than 60 years old. This building is due for renovation and the contractor appointed for the renovation wanted to start with a Revit model generated from the Laser scans. The client (contractor appointed for the renovation) was keen to develop a BIM model for all the ETR (existing to remain) for the utilities and an overall model to begin with the renovation. Read more Read less

Crystal Spires (Luxora Mist) @ Thane

This is a high rise residential tower of high-end apartments with 3 levels of parking and podium and clubhouse. The towers have multiple options for flats like Duplexes, 2BHK, 3BHK,… This is a high rise residential tower of high-end apartments with 3 levels of parking and podium and clubhouse. The towers have multiple options for flats like Duplexes, 2BHK, 3BHK, and 4BHK.

Excelize’s scope of work was to build a BIM model, coordinate with the structural and the services, Generate the BOQ’s and create Good For Construction documents.
Read more Read less

Mock-Up for A Hotel Suite of A 5-Star Hotel

Excelize’s scope of work was to build a BIM Architectural, structural and services model, coordinate between all the services, model the interiors and coordinate that with the other disciplines and… Excelize’s scope of work was to build a BIM Architectural, structural and services model, coordinate between all the services, model the interiors and coordinate that with the other disciplines and generate BOQ’s. Read more Read less

Residential Project Using MIVAN Structures

This Project was spread on a plot area of 5 acres and built up area of 100,000 sq. m 2 basement floor parking with G+ 40 storied building or residential… This Project was spread on a plot area of 5 acres and built up area of 100,000 sq. m 2 basement floor parking with G+ 40 storied building or residential flats, and penthouse floors.

The difference between this project and the other residential project is the use of MIVAN structures. The MIVAN structures were easy for installation, helpful to achieve speed in comparison to the conventional structure which in turn resulted in the quick completion of the project.

Read more Read less

Methodology of Extracting Form Work Quantity From BIM

The formwork quantity extracted was 99.06% accurate when compared with the quantity extracted by the site team. The formwork quantity extracted was 99.06% accurate when compared with the quantity extracted by the site team. Read more Read less

Infrastructure Project in The Middle East

Excelize has recently worked as a BIM consultant on an Infrastructure development project (Highway and Metro rail) in the Middle East. The scope was to provide 4D Construction simulation services… Excelize has recently worked as a BIM consultant on an Infrastructure development project (Highway and Metro rail) in the Middle East.

The scope was to provide 4D Construction simulation services for approximately 4.5 kilometers of Highway and metro rail. The simulation was generated to focus on major construction tasks such as excavation, foundations, and structural works, etc. The model was generated with LOD 200 as per relevant AIA specifications.
Read more Read less

BIM for the win

    Collaborate with Excelize

    On a mission to make AECO community future-ready
    and successful with technology

    Get a quote