Project Success Story

International Airport Terminal
Project Area: 480,000 m²
Our Contribution: Our scope of work essentially comprised of building a BIM model, to include clash detection and resolution, and vital coordination between the architectural, structural and services (MEPF) teams.…

Our Contribution: Our scope of work essentially comprised of building a BIM model, to include clash detection and resolution, and vital coordination between the architectural, structural and services (MEPF) teams. For this, we leveraged our team of on-site as well as off-site coordinators and modelers, to create the resolutions of the model and build the model at LOD 300, respectively.


Read more Read less
Metro Rail
Project Area: 18 Miles, with a total of 38 stations
Our Contribution: We were the 5D BIM consultants on this prestigious project and worked alongside consortium partners to facilitate 3D modeling, clash detection and conflict resolution. Leveraging the Bentley platform,…

Our Contribution: We were the 5D BIM consultants on this prestigious project and worked alongside consortium partners to facilitate 3D modeling, clash detection and conflict resolution. Leveraging the Bentley platform, namely AssetWise, ProjectWise and RIB iTWO, we created models, project schedules, construction sequencing and what-if scenarios.


Read more Read less
School
Project Area: 270,000 Sq. ft.
Our Contribution: For this high school building, we generated a BIM model at LOD 300, to consider the architectural and structural elements involved. We also worked on the exterior elevation details…

Our Contribution: For this high school building, we generated a BIM model at LOD 300, to consider the architectural and structural elements involved. We also worked on the exterior elevation details and materials, in addition to the site landscape and site elements. We created the BIM model from the input Point Cloud Data.


Read more Read less
Convention Centre
Project Area: 820,000 M
Our Contribution: Our involvement in this on-going project of a mixed-use international exhibition and convention center requires us to create 3D models for the architectural, structural and MEPF teams. Commencing with…

Our Contribution: Our involvement in this on-going project of a mixed-use international exhibition and convention center requires us to create 3D models for the architectural, structural and MEPF teams. Commencing with the design model, our work will continue through construction as well as the as-built model. With an on-site team, we have accounted for clash detection, as-built modeling and tagging for facilities management using COBIE standards.


Read more Read less
Residential Community
Project Area: 339,449 Sq. ft.
Our Contribution: We created the model for architectural, structural and MEPF services for this community living structure. By modeling important elements such as casework, fixtures and appliances at LOD 400,…

Our Contribution: We created the model for architectural, structural and MEPF services for this community living structure. By modeling important elements such as casework, fixtures and appliances at LOD 400, we maintained accuracy in the clearances required during construction and thus avoided unwarranted issues during installation. The tolerance for accuracy of the modeling was retained at 1/256.


Read more Read less
Super- Specialty Hospital
Project Area: 77 acres, with a built-up area of 390,182 M2
Our Contribution: This was the first hospital in Doha to have BIM and FM integration. We set up the BIM execution plan and facility management strategy at the start of the…

Our Contribution: This was the first hospital in Doha to have BIM and FM integration. We set up the BIM execution plan and facility management strategy at the start of the project, and then used the data to set up the SOPs for the modeling and facility management. Based on multiple workshops we carried out, we crated guidelines for BEP and FM. Using Revit, we built the model from scratch to LOD 300, developed further to LOD 500, for architectural, structural and MEPF services. Keeping future expansions and modifications in mind, we have been responsible for updating the as-built model and training the in-house BIM team.


Challenges faced: Some challenges we have faced are Missing data in the as built drawings to capture the complete information in the BIM, Discrepancies in as built drawings for above ceiling services and unresolved clash in as built drawings.


Benefits to the Client: Having a BIM model made it very easy for the FM team to understand the details from model and spend less time for this. the BIM model in seamlessly integrated which helps in locating the asset very easily in the model and thus in the physical building also. Future modification as built BIM helped in planning and resolving the issues easily.


Read more Read less
High-Rise Residential Project
Project Area: 650 feet tall with 60 floors
Our Contribution: Our mandate for this tall edifice was to build the BIM model for its electrical services, to enable the Design Build team to use BIM for better coordination.…

Our Contribution: Our mandate for this tall edifice was to build the BIM model for its electrical services, to enable the Design Build team to use BIM for better coordination. Aligning with sub-contractors to support the coordination process, we updated the model using Revit, based on our meetings, both online and offline.


Read more Read less
Hospitality Project
Project Area: 484,000 Sq. ft. with 247 rooms and 25,000 Sq. ft. of retail space
Our Contribution: Our mandate for this project was to generate the BIM model from the AutoCAD input data, to aid the architectural, structural and MEPF services. We created a 4D construction…

Our Contribution: Our mandate for this project was to generate the BIM model from the AutoCAD input data, to aid the architectural, structural and MEPF services. We created a 4D construction simulation, to track the progress of construction. Since this was a ‘fast-tracked building’ where design and construction would happen simultaneously, our team carried out frequent rounds of clash detection.


Read more Read less
IT SEZ
Project Area: 310,000 M2
Our Contribution: As BIM consultants for this large information technology park, we provided 3D, 4D and 5D services. Using Revit, we created 3D models at LOD 400 for the architectural, structural…

Our Contribution: As BIM consultants for this large information technology park, we provided 3D, 4D and 5D services. Using Revit, we created 3D models at LOD 400 for the architectural, structural and MEPF services. We leveraged 5D to extract quantities from the BIM model, to aid the site team with bill verifications and material management. What truly made this project unique was that we simultaneously executed 3 projects for the same client, across different locations.


Read more Read less
Greenfield Infrastructure
Project Area: 1.5KM2
Our Contribution: We have been working since design stage for past 3+ years. Did clash coordination during design stage, had on-site team thru construction that too inputs from various contractors and…

Our Contribution: We have been working since design stage for past 3+ years. Did clash coordination during design stage, had on-site team thru construction that too inputs from various contractors and updated the model. Also had a scanning team for past 2+ yrs during construction that collected point cloud data as construction happened using which the as-built model is developed. This on-going colossal greenfield project comprises of two parts – the construction of the spine and marina roads, and the construction of villa roads. Our scope of work includes 3D baseline modeling and 3D modeling, linking all BIM models with the project plans schedules for visualization and construction, extracting quantities for cost estimations, building an as-built model and verifying the BIM model based on point cloud data, among many others, across diverse services such as power, IT, telecom, utilities, landscaping, signages, signals, etc.


Read more Read less
International Airport Terminal
Project Area: 480,000 m²

Our Contribution: Our scope of work essentially comprised of building a BIM model, to include clash detection and resolution, and vital coordination between the architectural, structural and services (MEPF) teams. For this, we leveraged our team of on-site as well as off-site coordinators and modelers, to create the resolutions of the model and build the model at LOD 300, respectively.

Metro Rail
Project Area: 18 Miles, with a total of 38 stations

Our Contribution: We were the 5D BIM consultants on this prestigious project and worked alongside consortium partners to facilitate 3D modeling, clash detection and conflict resolution. Leveraging the Bentley platform, namely AssetWise, ProjectWise and RIB iTWO, we created models, project schedules, construction sequencing and what-if scenarios.

School
Project Area: 270,000 Sq. ft.

Our Contribution: For this high school building, we generated a BIM model at LOD 300, to consider the architectural and structural elements involved. We also worked on the exterior elevation details and materials, in addition to the site landscape and site elements. We created the BIM model from the input Point Cloud Data.

Convention Centre
Project Area: 820,000 M

Our Contribution: Our involvement in this on-going project of a mixed-use international exhibition and convention center requires us to create 3D models for the architectural, structural and MEPF teams. Commencing with the design model, our work will continue through construction as well as the as-built model. With an on-site team, we have accounted for clash detection, as-built modeling and tagging for facilities management using COBIE standards.

Residential Community
Project Area: 339,449 Sq. ft.

Our Contribution: We created the model for architectural, structural and MEPF services for this community living structure. By modeling important elements such as casework, fixtures and appliances at LOD 400, we maintained accuracy in the clearances required during construction and thus avoided unwarranted issues during installation. The tolerance for accuracy of the modeling was retained at 1/256.

Super- Specialty Hospital
Project Area: 77 acres, with a built-up area of 390,182 M2

Our Contribution: This was the first hospital in Doha to have BIM and FM integration. We set up the BIM execution plan and facility management strategy at the start of the project, and then used the data to set up the SOPs for the modeling and facility management. Based on multiple workshops we carried out, we crated guidelines for BEP and FM. Using Revit, we built the model from scratch to LOD 300, developed further to LOD 500, for architectural, structural and MEPF services. Keeping future expansions and modifications in mind, we have been responsible for updating the as-built model and training the in-house BIM team.

Challenges faced: Some challenges we have faced are Missing data in the as built drawings to capture the complete information in the BIM, Discrepancies in as built drawings for above ceiling services and unresolved clash in as built drawings.

Benefits to the Client: Having a BIM model made it very easy for the FM team to understand the details from model and spend less time for this. the BIM model in seamlessly integrated which helps in locating the asset very easily in the model and thus in the physical building also. Future modification as built BIM helped in planning and resolving the issues easily.

High-Rise Residential Project
Project Area: 650 feet tall with 60 floors

Our Contribution: Our mandate for this tall edifice was to build the BIM model for its electrical services, to enable the Design Build team to use BIM for better coordination. Aligning with sub-contractors to support the coordination process, we updated the model using Revit, based on our meetings, both online and offline.

Hospitality Project
Project Area: 484,000 Sq. ft. with 247 rooms and 25,000 Sq. ft. of retail space

Our Contribution: Our mandate for this project was to generate the BIM model from the AutoCAD input data, to aid the architectural, structural and MEPF services. We created a 4D construction simulation, to track the progress of construction. Since this was a ‘fast-tracked building’ where design and construction would happen simultaneously, our team carried out frequent rounds of clash detection.

IT SEZ
Project Area: 310,000 M2

Our Contribution: As BIM consultants for this large information technology park, we provided 3D, 4D and 5D services. Using Revit, we created 3D models at LOD 400 for the architectural, structural and MEPF services. We leveraged 5D to extract quantities from the BIM model, to aid the site team with bill verifications and material management. What truly made this project unique was that we simultaneously executed 3 projects for the same client, across different locations.

Greenfield Infrastructure
Project Area: 1.5KM2

Our Contribution: We have been working since design stage for past 3+ years. Did clash coordination during design stage, had on-site team thru construction that too inputs from various contractors and updated the model. Also had a scanning team for past 2+ yrs during construction that collected point cloud data as construction happened using which the as-built model is developed. This on-going colossal greenfield project comprises of two parts – the construction of the spine and marina roads, and the construction of villa roads. Our scope of work includes 3D baseline modeling and 3D modeling, linking all BIM models with the project plans schedules for visualization and construction, extracting quantities for cost estimations, building an as-built model and verifying the BIM model based on point cloud data, among many others, across diverse services such as power, IT, telecom, utilities, landscaping, signages, signals, etc.