BIM Capability Assessment

Know your BIM SWAG!

Are you a Starter, Warrior, Achiever or Guru? Discover where your organization stands on the BIM readiness with our complimentary assessment.

Inauguration of Autodesk Training Center at Excelize: 20th July 2009

2009

← Back

On this occasion CMD of Excelize Mr. Pratap Dhopte, Director Mrs. Sonali Dhopte, Mr. Parag Pande, Govt. Engineering College Principal Dr.W. Z. Gandhare, Hitech Engineering College Principal Dr. Ulhas Shivurkar, Mr. Halge, Mr. Sharma and others were present to grace the occasion. Mrs. Sonali Dhopte in her introduction about the center briefed that for high raised building Architects to provide drawings but details for services like Plumbing, Electrical details are not provided. Hence, there arise problems during and after the construction of a building. All these minor details will be taught to the students for this course. The one month course at Excelize Autodesk training center will help the students of Engineering, Architecture and also to ITI’s said the Hon. Minister Mr. Tope.

Collaborate with Excelize

On a mission to make AECO community future-ready
and successful with technology

Get a quote