Get a Quote

Point Cloud to Bim Modeling Services

 

For Accurate Models Of The As-built Environment

Our point cloud to BIM services creates accurate models for as-built purposes as well as for refurbishment and renovation projects. Point cloud modeling is widely recognized to be more precise than traditional surveys that use measuring tools. The 3D laser scanning technology first captures the as-built environment, then we import the survey data and process it by using software such as ArchiCAD and Autodesk Revit - this process is called point cloud to 3D model.

Our BIM experts can accurately transform point cloud data into a virtual model which is helpful to 3D laser scanning companies and design-build contractors involved in the renovation of a building structure.

While the main focus of BIM is on new building projects, the growing market in the refurbishment and renovation projects has led to rapid growth in the scan to CAD and scan to BIM services.

Our Point Cloud service offerings:

  • Scan to 3D model for architectural & structural components
  • Point cloud to MEP BIM modeling.
  • 3D scan to CAD
  • Scan to construction drawings
  • Point cloud to 3D model
  • Point cloud to Revit
Our Point Cloud service offerings
Why choose Excelize?

Why choose Excelize?

  • We utilize the latest technology to convert the point cloud to 3D model.
  • Our professional land surveyors and scan technicians validate the designed models by matching them with the scanned images to provide high-quality detailed visuals.
  • Our accurate and detailed Scan to BIM models converts laser survey data into sophisticated 3D BIM models which help in checking the feasibility of expansion or extension of the project.
  • Our services are cost-effective -: better build cost estimates reduce errors.
  • Our efficient teams have a quick turnaround time of data and deliverables.

Ready to adopt and benefit from BIM, with Excelize?

Contact Us
About Excelize
Global Locations
Follow Us On
Copyright © 2022 Excelize All Rights Reserved. | Privacy Policy