Excelize
Company
Story
Excelize team

Get to know how, since 2004, Excelize grew into the BIM partner U.S. AEC firms trust — 300+ clients served and 2,500+ projects delivered end to end.

Learn More
Book a Consultation
/ BIM Services

BIM Services for U.S. Architects, Engineers, and Contractors

One BIM partner for modeling, coordination, detailing, and takeoffs, delivered in your tools and to your standards, so the model your team builds from is clean and the field has nothing to fix.

Whether you need a single discipline modeled, a federated model coordinated clash-free, or shop and fabrication drawings the floor can build from, Excelize runs as your extended BIM team, working inside your tools and standards as one partner across the whole project, not a stack of vendors you have to manage.

2004Building BIM since
2,500+Projects delivered
LOD 100–500Concept to as-built & facility-ready
4Core platforms — Revit, Tekla, Navisworks & ACC
Explore our services
Ten services, one coordinated BIM partner See all ten
What BIM Services Cover

Every stage of the model, from concept to fabrication.

BIM services turn design intent into an accurate, data-rich 3D model that U.S. architects, engineers, contractors, and fabricators can coordinate, cost, and build from. Excelize covers the full range:

Every output is delivered in your formats and to your BIM execution plan.

01

3D modeling across every discipline

Architectural, structural, and MEP models at LOD 100 to 500, from concept massing to fabrication-level detail.

02

Multi-trade coordination & clash detection

Federated models coordinated in Navisworks, clashes caught and resolved before they reach the field.

03

Revit families & scan-to-BIM

Custom parametric Revit family creation, plus scan-to-BIM for accurate existing conditions.

04

4D scheduling, 5D cost & takeoffs

4D sequencing and 5D cost-linked models, with model-based quantity takeoffs that update as the design changes.

05

Shop, fabrication, spool & 2D drawings

Shop, fabrication, spool, and 2D coordination drawings the trades can build and fabricate from.

Explore Our BIM Services

Ten services, one coordinated BIM partner.

How We Work

Inside your workflow, from BEP to handoff.

Autodesk Revit AutoCAD Autodesk BIM 360 Tekla Autodesk Navisworks
1

Your environment

We model in Revit, Tekla, and AutoCAD, coordinate in Navisworks, and work inside your CDE — Autodesk Construction Cloud, BIM 360, or Revizto — to your BEP, templates, and LOD.

2

Embedded in 48 hours

A modeler, coordinator, or pod on your project in two days, not the weeks an in-house hire takes to ramp.

Exploded BIM model
3

QA at every milestone

Documented quality checks and senior sign-off before anything reaches you, with clash reports issued in BCF, Excel, or HTML.

4

Yours to keep, secure by default

We work under NDA, and the models, families, and standards we build are delivered to you in your formats — RVT, NWC/NWF, IFC, DWG, and COBie.

The Business Case

The real cost of uncoordinated BIM.

Rework driven by bad data and miscommunication costs the U.S. construction industry an estimated $31.3 billion a year, and most of it is avoidable in the model. Catching conflicts before the field is where the return lives: one documented program turned a $200,000 investment in clash detection into roughly $2.5 million in avoided cost, about a 10x return.

Good BIM isn't a line item — it's the cheapest insurance on the job. A model coordinated to LOD 350 before fabrication keeps RFIs down, change orders rare, and your senior people on the work only they can do, instead of redoing a low-cost vendor's output.

$31.3B annual U.S. rework from bad data and miscommunication
10x documented clash-detection ROI — $200K in, ~$2.5M avoided
100–500 LOD full modeling range, concept to as-built

See the model quality before you commit.

Send us a live U.S. project, a scope, a model, or a set of drawings, and we’ll return a coordinated sample deliverable, built to your standards, in 2 to 3 days. Real BEP, real model, real clash report, so you judge the work before you decide anything.

Three ways to work with us.

Free Sample First

Send a real U.S. scope or model. We return a coordinated sample deliverable, built to your standards, in 2 to 3 days, so you can judge the work before any commitment.

Get a Free Sample →

Project-Based

A defined scope and fixed deliverables, modeled and coordinated to your BEP and LOD. Best when you have a specific U.S. project that needs modeling, coordination, detailing, or takeoffs.

Scope a Project →

Pricing is scoped to the work, by the project or by the month. Send a real scope, and we’ll size it with you, with no long-term lock-in.

Related Resources

Who We Help

Built around your role on the project.

General Contractors & CMs

Coordination, clash detection, takeoffs, and a model the field can build from.

Explore

Architecture Firms

Revit modeling, CD sets, and families that carry your standards.

Explore

MEP & Fire-Protection Engineers

Coordinated mechanical, electrical, plumbing, and fire-protection models your engineer reviews and seals.

Explore

Subcontractors & Fabricators

Shop, fabrication, and spool drawings the shop can build from.

Explore
FAQs

BIM services questions, answered.

Still have questions? Talk to a BIM Lead
BIM services create accurate, data-rich 3D models that AEC teams use to coordinate, cost, and build a project. They span 3D modeling, clash detection and coordination, Revit family creation, scan-to-BIM, 4D and 5D, quantity takeoffs, and shop, fabrication, and spool drawings.
We model in Revit, Tekla, and AutoCAD, coordinate and run clash detection in Navisworks Manage, and work inside Autodesk Construction Cloud, BIM 360, or Revizto. We deliver in your formats, including RVT, NWC/NWF, IFC, DWG, and COBie.
We model to the level your project requires, using AIA G202 and BIMForum LOD definitions, from LOD 100 concept models through LOD 500 as-built and facility-ready models. Most multi-trade coordination runs at LOD 350.
Cost depends on scope, discipline, LOD, and how you engage, project-based or a dedicated team. The fastest way to a number is to send a real scope; we will scope it and return a sample so you see the quality before you commit.
We federate the discipline models, run hard, soft, and workflow clash detection in Navisworks, resolve conflicts trade by trade, and report them in BCF, Excel, or HTML so your team can track every issue to closure.
A modeler, coordinator, or pod can be embedded on your project within 48 hours and be productive in the first week because we already work in your tools and standards.
Yes. We work under NDA, and every model, family, and template we build is delivered to you. Your data and IP stay yours.

One model. Every discipline. Send us a real project.

Share a scope, a model, or a set of drawings. We’ll return a coordinated sample deliverable, built to your standards, in 2 to 3 days, so you can judge the work before you commit to anything.

  • No contract
  • No obligation
  • Your models and your IP stay yours