EXCELIZE

Why Excelize

Innovative environment
Excelize nurtures a culture of innovation where new ideas are encouraged, and creativity thrives. Join a team that is constantly pushing the boundaries of what's possible in the AECO industry.
Collaborative team
Teamwork is at the core of everything we do. Work alongside industry experts, engineers, architects, and project managers who are dedicated to delivering exceptional results.
Professional growth
Excelize is committed to the professional growth and development of its employees. Take advantage of opportunities for training, mentorship, and career advancement as you expand your skills and expertise.
Impactful work
Join a company that is making a real difference in the world. Work on diverse projects spanning commercial, residential, infrastructure, and healthcare sectors, shaping communities worldwide.

Life at Excelize

We believe in pushing boundaries and having a blast while doing it. From team outings to exciting office events, we make sure that every moment is filled with laughter and camaraderie.

Open Positions

HVAC Design Engineer (2-5 years)
Aurangabad

HVAC Design Engineer (2-5 years)

Aurangabad

About the role:

 

We are seeking a motivated and detail-oriented Heating, Ventilation, and Air Conditioning (HVAC) Engineer with up to 5 years of professional experience. The ideal candidate will have hands-on experience in HVAC design, analysis, duct sizing pressure balancing and project execution, along with proficiency in industry-standard software tools such as Energy Pro, HAP, or similar. A solid understanding of ASHRAE standards and/or California Title 24 energy codes is required.

 

Responsibilities: ·Design and develop HVAC systems, including load calculations, system sizing, and equipment selection.

·        Conduct energy modeling and performance simulations using tools such as Energy Pro, similar software.

·Ensure designs comply with ASHRAE standards, California Title 24 energy codes, and other relevant regulations.

·Collaborate with architects, contractors, and other engineers to coordinate HVAC systems with overall project designs.

·Prepare and review project documentation, including specifications, drawings, and reports.

·Identify opportunities for energy efficiency and sustainability in system designs.

 

Candidate requirements:

 

·Bachelor’s degree in mechanical engineering or a related field.

·3-5 years of experience in HVAC design.

·Proficiency in Energy Pro, or comparable HVAC software tools.

·Familiarity with ASHRAE standards and/or California Title 24 energy codes.

·Strong understanding of HVAC system principles, energy modeling, and building performance analysis.

·Excellent problem-solving skills and attention to detail.

·Strong communication and teamwork abilities.

 



BIMagine the possibilities

    Collaborate with Excelize

    On a mission to make AECO community future-ready
    and successful with technology

    Get a quote