BIM Capability Assessment

Know your BIM SWAG!

Are you a Starter, Warrior, Achiever or Guru? Discover where your organization stands on the BIM readiness with our complimentary assessment.

Specialty trade coordination and integration
Prefabrication and modular construction
Installation sequencing and coordination assistance
Field data capture and reporting tools
Trade-specific training and development programs

Win with BIM

Automated clash detection
Automate clash detection to eliminate rework and delays
Risk mitigation
Mitigate construction risks with accurate real time information
Service synchronization
Efficiently synchronize varied building services and trades
Cost and time savings
Minimize schedule overruns, rework and save costs
Streamlined fabrication
Utilize BIM models for streamlined fabrication
Transparency in coordination
Ensure transparency during coordination, leading to reduced rework

Collaborate with Excelize

On a mission to make AECO community future-ready
and successful with technology

Get a quote