Mechanical, electrical and plumbing (MEP) services are critical engineering services for any construction project. These are related to building design and construction and must be accurately planned to ensure that projects get completed as per specification, without obstacles.
Our building information modeling (BIM) service allow architects, builders, engineers, and developers to gain better control over their projects and is set to become the standard operating procedure for construction projects around the world.
Of all the MEP trades, plumbing design is the only trade that is essential for life, providing clean drinking water and removal of wastewater from our buildings.
An efficient plumbing system starts with a design that saves water and energy resources. A good design incorporates short runs between plumbing fixtures and uses state-of-the-art materials. A plumbing design includes two systems: the system that supplies water and the system that gets rid of waste. The drain system also has vent stacks that allow drainpipes to breathe and move sewer waste through the sewer pipes.
Our service offerings:
We are involved in the designing of storm drainage systems, domestic cold and hot water systems and sanitary sewer systems, along with reviewing how to properly coordinate these utilities with the architects and structural engineers.
Why choose Excelize?
Our on-shore support team based in Costa Mesa, USA enables close coordination with your team and our development center in India enables us to deliver results to our US-based clients round the clock
Looking to outsource BIM services? Talk to our experts, now!
We will be glad to assist you!