BIM Modeling For Bendi Bazar Redevelopment

Excelize is working on the Bhendi Bazar rehab project as a BIM consultant. Approximate area considered for this project is 1,811,373 sq. ... Read more

Model and Produce shop drawings for a Residential Unit USA

The project required a model of LOD 300 level for a residential unit. Client has shared us hand sketches of design as inputs and some documents as a reference to model and produce the typology. After ... Read more

Championing the Sustainability Movement public park in Qatar.

Spread across 50,000 square meters and serving close to 3000 visitors daily, the park has a one-of-its-kind cooling and air conditioning system used for the jogging tracks to ensure that pedestrians a... Read more

A women & children super specialty hospital in Doha, Qatar

A women & children super specialty hospital in Doha, Qatar is the focus of this case study. Spread over 77 acres, the project required us to build an as-built BIM model using 2D drawings, add asse... Read more

BIM Modelling for a luxury hotel renovation and expansion project in Mumbai, India

  One of the most iconic luxury names in hospitality, this brand was looking to renovate and add additional spaces to their hotel located in Mumbai, India. The project required renovation of a... Read more

BIM Modelling for a multinational retail coffee chain

An American, multinational chain of coffee houses and cafes required a BIM model for improved construction coordination for one of their locations in California. Spanning across an area of 2,658 sq. f... Read more

BIM Modelling for designing the plumbing system for a 4-storey residential apartment

A plumbing design contractor who designed and installed the plumbing system, required BIM Modelling for a residential apartment at Walnut Creek, California, USA. The building comprised of the basement... Read more

BIM Modelling for a Manufacturing Unit in India

A global leader in the food coloring sector had to set up a new industrial unit for processing food flavors and fragrances near Pune, India. The site for the new facility is spread over 10 acres, wher... Read more

14-storey 5-star hotel in USA

A 14-storey 5-star hotel in USA, a huge parking space, a retail space at the ground level located at a prominent corner in the city needed BIM support as a mixed-use development project. The project c... Read more

BIM Modelling for a mixed use building

A Mixed-Use project where BIM was implemented through Schematic Design, Detail Design, GFC and as built stage. The project spanned an area of 16,35,000 sq. feet. with services apartments over 11 floor... Read more

BIM Modelling for a site infrastructure development project in Florida, USA

A 2,52,000 sq feet site infrastructure development project by a Florida-based construction group required a co-ordinated BIM model of all existing as well as proposed underground utilities on the site... Read more

BIM Modelling for designing a luxury mixed use community with commercial and residential amenities

A mixed use project in Doha, Qatar comprising of residential towers, clubhouse, community spaces, mosque, beach front villas, etc presented complexities in coordination and thus required BIM models fo... Read more

BIM Modelling for designing the plumbing system for a 4-storey residential apartment

A plumbing design contractor who designed and installed the plumbing system, required BIM Modelling for a residential apartment on the west coast, USA. The building comprised of the basement + 4 level... Read more

Creation of 3D BIM Model for infrastructure construction in an island city in Qatar

A luxury island in the greenfield city of Lusail, Qatar is being developed. Infrastructure and landscaping are being done over an area 50 square kilometers. The development includes the construction o... Read more

Scan to BIM Heritage building

Excelize has worked as a BIM Consultant to provide Scan to BIM services for a heritage building which is more than 60 years old. This building is due for renovation and the contractor appointed for th... Read more

Crystal Spires (Luxora Mist) @ Thane

This is a high rise residential tower of high-end apartments with 3 levels of parking and podium and clubhouse. The towers have multiple options for flats like Duplexes, 2BHK, 3BHK, and 4BHK. Excel... Read more

Mock-up for a hotel suite of a 5-star hotel

Excelize’s scope of work was to build a BIM Architectural, structural and services model, coordinate between all the services, model the interiors and coordinate that with the other disciplines ... Read more

Residential project using MIVAN Structures

This Project was spread on a plot area of 5 acres and built up area of 100,000 sq. m 2 basement floor parking with G+ 40 storied building or residential flats, and penthouse floors. The difference ... Read more

Methodology of extracting Form work quantity from BIM

The formwork quantity extracted was 99.06% accurate when compared with the quantity extracted by the site team. ... Read more

Infrastructure Project in the Middle East

Excelize has recently worked as a BIM consultant on an Infrastructure development project (Highway and Metro rail) in the Middle East. The scope was to provide 4D Construction simulation services f... Read more