Plumbing - The Third Dimension, Essential For Life

banner13

Plumbing Design

Mechanical, electrical and plumbing (MEP) services are critical engineering services for any construction project. These are related to building design and construction and must be accurately planned to ensure that projects get completed as per specification, without obstacles.

Our building information modeling (BIM) service allow architects, builders, engineers, and developers to gain better control over their projects and is set to become the standard operating procedure for construction projects around the world.

Of all the MEP trades, plumbing design is the only trade that is essential for life, providing clean drinking water and removal of wastewater from our buildings.

An efficient plumbing system starts with a design that saves water and energy resources. A good design incorporates short runs between plumbing fixtures and uses state-of-the-art materials. A plumbing design includes two systems: the system that supplies water and the system that gets rid of waste. The drain system also has vent stacks that allow drainpipes to breathe and move sewer waste through the sewer pipes.

Our service offerings:

We are involved in the designing of storm drainage systems, domestic cold and hot water systems and sanitary sewer systems, along with reviewing how to properly coordinate these utilities with the architects and structural engineers.

  • HW/CW domestic supply system
  • Sanitary-sewer drainage system
  • Stormwater harvesting and irrigation system
  • Drainage waste fixture unit calculations
  • Water supply load and fixture calculations
  • Sizing and selection of PRV's, pumps, storage tanks, interceptors etc.
  • Hydronic / non-hydronic system design
  • Booster pump design and pressure loss calculation
  • Fabrication drawings for equipment and fitting accessories

Why choose Excelize?

  • We have the technical expertise to formulate initial design concepts and draft recommendations from preliminary design data, detailing and installation of plumbing and drainage.
  • We understand that your clients expect the highest level of service and cost-effective solutions that are environmentally sound.
  • We offer superior quality, time-bound MEP engineering design, and support services with knowledge of US mechanical and plumbing codes.
  • We understand the requirements and constraints of building services and how they are affected by structural and architectural elements.
  • Through BIM visual analysis we provide the best safety standards in a building.
  • Quicker turnaround time, as outsourcing leverages the time zone difference to take your projects ahead round-the-clock.
  • Our comprehensive audits, evaluations, inspections, code calculations, and recommendations are all aimed at achieving optimal life cycle costing.

Our on-shore support team based in Costa Mesa, USA enables close coordination with your team and our development center in India enables us to deliver results to our US-based clients round the clock

Looking to outsource BIM services?  Talk to our experts, now!

We will be glad to assist you!