Architectural BIM Services

banner13

Excelize offers a range of architectural BIM modeling services, assisting its customers to better visualize the project before it enters the construction stage. 

Excelize is a one-stop solution for all your architectural BIM modeling requirements. Our architects, engineers, and construction professionals are well aware of the numerous benefits that a BIM-based design process offers, they prefer BIM to other platforms. As a result, we can promise our clients that they will get a perfect result in the most effective manner.

The architectural BIM modeling services provided by Excelize touch all the areas including creating building information models from sketches, CAD drawings, documentation in BIM, analysis, clash detection and content creation. We work with our clients through the design process from schematic design to design development and construction documentation and are responsible for complete BIM modeling.

ADVANTAGES OF ARCHITECTURAL BIM SERVICES TO THE CLIENTS

We at Excelize provide customized Architectural BIM modeling services as per the requirements of our clients by directly communicating with their team assisting them to review the model for various requirements. In short, our clients get high-quality architectural design services at very competitive prices. We have successfully implemented BIM projects for many high rise buildings, healthcare projects, hotels & convention center, schools, colleges and university buildings, large commercial projects and many more.

THE KEY BENEFITS OF ARCHITECTURAL BIM SERVICES FOR CLIENTS ARE:

  • Reduce risk
  • Reduce change orders
  • Schedule optimization
  • Schedule compression
  • Improve design quality
  • Efficient handover

Our architectural BIM modeling services deliver accurate and up-to-date information about the design scope, costs, quantities and all other properties of the building components. The architectural BIM modeling services offered by Excelize extends to maintaining and managing all design changes and project updates. So, the project architect can make better well-informed decisions that will help minimize the design errors. As a result, our expert architects can improve coordination of drawings and documents that provide seamless integration between design, analysis, engineering, construction and operations for the entire life-cycle of facilities.

THE ARCHITECTURAL BIM MODELING SERVICES PROVIDED BY EXCELIZE INCLUDE:

SCHEMATIC DESIGN

  • Exterior view of the building
  • Interior view of the building
  • 3D Visualization
  • Intelligent libraries for different building components with various styles and specifications

DESIGN DEVELOPMENT

  • Elevations
  • Floor plans
  • Building schemes
  • Information on material specifications, quantities, time schedules and costs

CONSTRUCTION DOCUMENT

  • Building Sections
  • Staircase/Vertical Circulation details
  • Construction details

The architectural BIM modeling services create a shared information resource that helps in making the building process client friendly. It can facilitate the workflow and improve efficiency and profitability.

Looking for outsourcing BIM services, don’t hesitate “Talk to our Experts” and get answers to your queries.
Team Excelize will be glad to assist you!