Contact Us

Project Manager – Design (International Projects)

Location:

Initially Aurangabad India and then California, USA

Qualification:

  • BE Mechanical from reputed university
  • Masters (or foreign equivalent) in Mechanical Engineering or Construction Management from reputed
    university.

Responsibilities:

  • The Project Manager is directly responsible for scheduling all phases of a project, the technical
    specifications necessary to acquire equipment and materials.
  • Work cooperatively and collaboratively with existing team of designers and engineers to follow through
    with tasks and recommend solutions for project designs.
  • Mentoring of staff, perform periodic model review.
  • Coordinate and trouble shoot technical items with clients, consultants and other departments.
  • A strong sense of urgency and initiative. Able to quickly study and react to complex issues.
  • Excellent problem-solving skills and the ability to confidently and decisively take action.
  • This position will perform the engineering, design and commissioning of equipment.
  • Ability to manage multiple design projects at a time.
  • Exposure and working knowledge of Revit.
  • 3+ years of project management experience.