EXCELIZE

BIM Cost Estimation | 5D Modeling Services

0 +

Years of BIM leadership

0 +

Project Completed

0 +

companies prefer Excelize as BIM partner

0 +

global offices and capability centers

Worried about escalating costs? Unable to pinpoint the reason? We have just the solution for you! Accurate cost estimation plays a vital role in building projects, as it determines the scope and bidding for a project.

The construction industry depends on BIM for documenting all information required for a building project.

Based on BIM quantities and 4D scheduling through BIM models, we monitor actual costs and construction material procurement plans during the construction phase. This in a nutshell is BIM 5D Modeling services.

We provide BIM 5D Modeling services to architects, constructors, designers, operators, owners, manufacturers, engineers, sub-contractors and material suppliers.

BIM cost estimation services offered by Excelize

  • Architectural, structural, MEP integration
  • Creation of Revit Family libraries
  • Creation of a virtual intelligent 3D Model
  • Clash detection and risk mitigation
  • Extraction of accurate project information
  • Quality construction documents
  • Construction bid estimates
  • Contractor estimate reviews
  • Cost modeling
  • Quantity take-offs
  • Life cycle costing.
  • Master planning cost estimating and analysis
  • Material escalation analysis

Project Highlights

Strong Domain Expertise

We convert all types of architectural, engineering, and various technical drawings to the format our clients need, within a stipulated time. Our CAD outsourcing services in India combine experience in CAD platforms and design software with strong domain expertise in the construction sector, to create a formidable service offering.

Collaborate with Excelize

On a mission to make AECO community future-ready
and successful with technology

Get a Quote

    (Compatible file types- pdf, dwg of size below 20 MB) For file size greater than 20 MB, use a third party service (Dropbox, Wetransfer or Yousendit) or contact us for FTP.)

    Get a quote