EXCELIZE

ARCHITECTURAL BIM SERVICES

0 +

Years of BIM leadership

0 +

Project Completed

0 +

companies prefer Excelize as BIM partner

0 +

global offices and capability centers

ARCHITECTURAL BIM SERVICES

Excelize offers a range of architectural BIM modeling services, assisting its customers to better visualize the project before it enters the construction stage.
Excelize is a one-stop solution for all your architectural BIM modeling requirements. Our architects, engineers, and construction professionals are well aware of the numerous benefits that a BIM-based design process offers, they prefer BIM to other platforms. As a result, we can promise our clients that they will get a perfect result in the most effective manner.

architectural shop drawing

The architectural BIM modeling services provided by Excelize touch all the areas including creating building information models from sketches, CAD drawings, documentation in BIM, analysis, Cash Detection and content creation. We work with our clients through the design process from schematic design to design development and construction documentation and are responsible for complete BIM modeling.

Key Benefits For Clients

Our architectural BIM modeling services deliver accurate and up-to-date information about the design scope, costs, quantities and all other properties of the building components.

The architectural BIM modeling services offered by Excelize extend to maintaining and managing all design changes and project updates. So, the project architect can make better well-informed decisions that will help minimize the design errors. As a result, our expert architects can improve the coordination of drawings and documents that provide seamless integration between design, analysis, engineering, construction and operations for the entire life-cycle of facilities.

Advantages of Choosing Our Structural BIM Services

shop drawing services

Schematic Design

1) Exterior view of the building 2) Interior view of the building 3) 3D Visualization 4) Intelligent libraries for different building components with various styles and specifications
Paper to CAD Conversion Services for Architecture and Engineering | excelize

Design Development

1) Elevations 2) Floor plans 3) Building schemes 4) Information on material specifications, quantities, time schedules and costs
Facade Shop Drawings

Construction Document

1) Building Sections 2) Staircase/Vertical Circulation details 3) Construction details

Project Highlights

Collaborate with Excelize

On a mission to make AECO community future-ready
and successful with technology

Get a Quote

    (Compatible file types- pdf, dwg of size below 20 MB) For file size greater than 20 MB, use a third party service (Dropbox, Wetransfer or Yousendit) or contact us for FTP.)

    Get a quote