EXCELIZE

How Architects Use BIM for Design: BIM Architecture

BIM process look like for architects

Architects and engineers alike turn to Building information modeling (BIM) to improve building design, and construction processes, and create dynamic and streamlined structures. Moreover, among those who use architectural BIM modeling, about 83% of users have experienced a positive ROI on their investments.

BIM allows designers to design and create more effectively by connecting the multi-dimensional model to the 2D drawing.

Let’s talk more about how architects use BIM for the design process in the AEC industry.

What does the BIM process look like for architects?

BIM has played an important role in transforming design and construction. It allows design teams to work more efficiently and explore designs before they are built.

 

Although every firm has standard operating procedures and manuals for BIM, the following are some of the core steps in the BIM process that architects or BIM architects usually follow:

  • Predesign – The predesign stage is to determine if BIM can be used on the project. The first step is to have a BIM roadmap to define how the BIM tool fits into a company’s larger strategy. The roadmap can help develop and improve the architect’s workflow by documenting short- and long-term strategic goals. It helps identify ways to leverage BIM through building analysis simulation.
  • Schematic model – After taking the necessary call on BIM, the architect starts creating the schematic model by using real elements in a BIM environment.
  • Presentation of the schematic model – The architect then gives a walkthrough or rendering of the schematic model. Specific BIM Software like Autodesk Revit are used during this presentation. To create an architectural BIM model apart from the BIM Software we also need input data like dimensions, layout, the material, etc.
  • Schematic design – At this point, scheduling and estimating are done. Scheduling helps make sure that the building can be built in the allotted time and estimating helps track the cost of the project. However, it can be a very laborious process to count all the elements of a process project from a 2D plan. But BIM helps simplify this process and saves time.
  • Interference checks and coordination reviews – In this phase of the design process, regular meetings are held between the architects, engineers, project managers, and construction managers. During these meetings, interference checks, and coordination reviews are done. BIM provides several collaborative tools that make this process easier. Moreover, these meetings help catch any mistakes in the early design phase itself.
  • Element ownership – Ownership of elements is another important factor to consider. It refers to figuring out which discipline modeled an element. The owner of a particular element, also known as model element author or MEA, needs to pay extra attention to the coordination of that element
  • Construction – Construction is the final phase after the building design is created. Since during the design phase, scheduling and estimating have been done, it means that items have been purchased and the schedule has been modified to complete the construction process on time. During the construction phase, the construction manager and field superintendent collaborate with the design team to ensure that the design is implemented. BIM helps create a strong connection between design and construction and promotes collaboration. This results in making the journey from design to construction quite seamless.

How does BIM help architects in the design process?

A big reason why BIM proves beneficial in improving design is that it enables collaboration between the designers, owners, and builders. Having the same source of information improves the design, implementation, and decision-making process immensely.

Some other ways in which BIM help architects are –

  • Improved communication – BIM allows all information related to the design of the building to be shared across all concerned parties. This means that all the architects on the team can instantly refer to the latest designs. This helps eliminate confusion and allows improved collaboration among all the stakeholders and construction professionals in real time.
  • Better visualization – BIM enables architects to see the buildings in basic 3D dimensions (height, width, and depth) along with 4D dimension (time to complete each element) and 5D dimension (cost at each stage). These detailed visualization tools help speed up the process from design to construction.
  • Higher quality – Due to proper documentation and calculation of important designs, there are higher-quality designs and construction processes. BIM allows construction managers to view where every element needs to go. This keeps the building activity operating at peak efficiency.
  • Preconstruction simulations – BIM allows architects to visualize and plan the entire project during preconstruction. They can use space-use simulations and visualizations to analyse the space beforehand and make changes to the design before starting construction process. Having a greater overview minimizes expensive changes later.
  • Improved coordination – BIM significantly improves the coordination between subcontractors and the project teams. It also helps avoid clashes with automated clash detection. This reduces the amount of rework needed, reduce the cost and saves the time. Using BIM, one can avoid unforeseen issues by enabling easy reviewing.
  • Better scheduling – BIM helps reduce the time of project cycles by eliminating construction schedule setbacks. It helps schedules to be planned with better accuracy. This along with improved coordination can help complete projects on time and save costs.
  • Simpler building maintenance – BIM enables observing the anticipated operational costs for a building once it’s complete. This can help make better decisions to improve cost savings and thus, ensure simpler building maintenance in the future.

BIM is an invaluable tool for architects. In fact, it’s probably fair to say that those architects utilizing BIM have a greater chance of creating good designs while saving costs and improving process efficiency.

Here is the list of some of the BIM software

To create an architectural BIM model for any building design BIM software must need. By putting the accurate data into the BIM software, we can have the real time building design of the dedicated project.

  • Autodesk Revit
  • Vectorworks
  • Navisworks
  • ArchiCAD

Overall, for the creation architectural BIM model for any project involves software, accurate input data of the building and all other necessary information. Furthermore, you can use validation and verification tools like clash detection to identify and correct the errors, regularly review and update the model to up to date throughout the project.

Collaborate with Excelize

On a mission to make AECO community future-ready
and successful with technology

Get a quote