
BIM Services
Concept to fabrication — coordinated Revit models, clash-free federated files and drawing sets your field crews can build from.
All services
BIM insights, how-tos and industry deep dives for AEC teams.
Free downloadable guides for precon, VDC and BIM leaders.
Monthly BIM insights and project lessons in your inbox.
ROI Calculator and ISO 19650 readiness checklist.
Real projects with results in numbers, across five verticals.
Model demos and project explainers.
Step-by-step model and project walkthroughs.
What Is BIM Coordination? Clash Detection, LOD, and the Federated Model Explained
In-House BIM Team vs Outsourcing: What It Actually Costs a U.S. Firm
ISO 19650 Explained: What U.S. AEC Firms Need to Know Before Their Next Bid
Read more40-Story Office Tower, Dallas — 12 Trades Coordinated Clash-Free
420,000 sq ft of Class A commercial delivered at LOD 350 — full coordination, clash resolution and model-linked quantity takeoffs across every discipline.
Get to know how, since 2004, Excelize grew into the BIM partner U.S. AEC firms trust — 300+ clients served and 2,500+ projects delivered end to end.
Learn MoreHow We Work
Trust
Careers
We build custom parametric Revit families for products, equipment, and systems. Accurate, lightweight, and built to your standards, so your models stay consistent and fast.
Off-the-shelf families slow your model down and break your standards. Excelize builds families to your template, your parameters, and your graphics, so every project starts consistent and stays light.
A Revit family is a reusable, parametric component, such as a door, a light fixture, or a piece of equipment, with built-in geometry, parameters, and behavior. Family creation is the work of building those components to a standard so they flex across projects. Excelize builds custom parametric families for U.S. firms and manufacturers, from LOD 100 to 500, optimized for file size and built to your template.
Doors, windows, fixtures, equipment, and assemblies built to flex with parameters.
Product-accurate families for manufacturers, ready for catalogs like BIMobject or NBS.
Full libraries built to your office template and naming standards.
Shared parameters, type catalogs, and data for scheduling and takeoffs.
Geometry and detail to the level each phase needs.
Lightweight families that do not bloat your model, checked against your standards.
We confirm specs, cut sheets, your template, and parameters.
The parametric family is built and flexed across types.
Shared parameters, schedules, and your graphic standards applied.
Tested across types and sizes, checked for file size and integrity.
Delivered in RFA or as a library, with a window for revisions.
Autodesk Revit, built to your office template.

AIA G202 and BIMForum LOD, your naming and parameter standards.
Architectural, structural, MEP, furniture, equipment, and manufacturer products.
RFA families and type catalogs, manufacturer-ready for BIMobject or NBS.
We build the family types U.S. firms and manufacturers need most:

Doors, windows, casework, and detail components.

Mechanical, electrical, plumbing, and fire-protection devices and equipment.

FF&E families for layouts and schedules.

Product-accurate, catalog-ready families for building-product makers.

Share a product spec or a sample family. We will build one to your standards in 2 to 3 days, so you can see the quality before you commit.
Bad families are a hidden tax. A bloated or off-standard family slows every model it lands in and breaks schedules and takeoffs downstream. Families built right, parametric, light, and to your standard, keep your models fast and your data clean.
Send a cut sheet or sample family. We build one to your standards in 2 to 3 days.
Get a Free Sample →A named content modeler embedded month to month, scaled to your backlog.
Talk to a BIM Lead →Pricing is scoped to the work, by the family, the library, or the month. No long-term lock-in.
2,500+ projects and deep parametric content experience.
Real offices in New Jersey and California, families built to your template.
Lightweight families that keep your models fast.
We work under NDA; every family is delivered to you.
You own the outcome. We own the production.
Federate and clash-check the models your families populate.
Explore
Share a product spec or sample family and we will build one to your standards in 2 to 3 days, so you can judge the quality before you commit.