
BIM Services
Concept to fabrication — coordinated Revit models, clash-free federated files and drawing sets your field crews can build from.
All services
BIM insights, how-tos and industry deep dives for AEC teams.
Free downloadable guides for precon, VDC and BIM leaders.
Monthly BIM insights and project lessons in your inbox.
ROI Calculator and ISO 19650 readiness checklist.
Real projects with results in numbers, across five verticals.
Model demos and project explainers.
Step-by-step model and project walkthroughs.
What Is BIM Coordination? Clash Detection, LOD, and the Federated Model Explained
In-House BIM Team vs Outsourcing: What It Actually Costs a U.S. Firm
ISO 19650 Explained: What U.S. AEC Firms Need to Know Before Their Next Bid
Read more40-Story Office Tower, Dallas — 12 Trades Coordinated Clash-Free
420,000 sq ft of Class A commercial delivered at LOD 350 — full coordination, clash resolution and model-linked quantity takeoffs across every discipline.
Get to know how, since 2004, Excelize grew into the BIM partner U.S. AEC firms trust — 300+ clients served and 2,500+ projects delivered end to end.
Learn MoreHow We Work
Trust
Careers
Extended design capacity, code-compliant calculations, and coordination-ready drawings, delivered under your own engineer of record’s review.
Design capacity is usually the actual bottleneck, not talent. A firm has more MEP or architectural design work than it has hours, and the choice becomes turning work away or finding a team that can plug directly into an existing workflow. Excelize has provided MEP engineering design and coordination support to consultants, consulting firms, and Design-Build teams since 2004, working as an extension of your team, under your review and your stamp, not as a separate engineering authority.
Design Support is Excelize’s practice for extending an MEP or architecture firm’s own design capacity. It doesn’t replace your firm’s engineering authority.
It splits into two connected services. Engineering Design Support covers the design, development, and coordination work itself. This includes model visualization, MEP system design and drafting, constructability analysis, and coordination through plan-check.
Design Calculations covers the code-based calculations that support the design. These are referenced against U.S. mechanical and plumbing codes. Your firm’s own engineer of record reviews and seals every calculation.
Every deliverable from either service is built to sit inside your existing review process. Nothing here works around it.
Carrying more design and coordination workload than current staff can move through plan-check on schedule, without wanting to make a permanent hire for a workload that fluctuates project to project.
That need MEP-aware design development support early, from initial design development (0% DD) onward, so building services coordination isn’t a late-stage scramble against structural and architectural constraints already locked in.
Managing multiple disciplines at once, where design capacity and coordination bandwidth are the actual constraints on how many active projects a firm can carry simultaneously.
HVAC design, energy efficiency, and ventilation standards that govern mechanical system design in the U.S.

Fire protection and life safety system standards, from suppression layout to alarm and egress requirements.

Electrical system design and installation safety, the code basis behind every power and distribution layout.

Ductwork construction and installation standards, from gauge and reinforcement to hanger and seismic requirements.

We confirm which disciplines, project phase, and jurisdiction's code basis (mechanical, plumbing, electrical) the work needs to reference, so calculations and design development start from the right standard.
Our team develops the design model or calculation set, using your firm's standards, templates, and coordination guidelines, not a generic in-house methodology substituted for yours.
Before anything reaches your team, we run it against our own quality checks, coordination clashes, calculation consistency, code-basis accuracy, so your engineer's review starts from a clean draft, not raw output.
Work is delivered in your required format for your engineer of record's review, revision, and seal. We're explicit that this step is not optional or bypassable, it's the point of the whole arrangement.
We incorporate your engineer's markups and revisions until the deliverable is ready for permit or construction, and hand over final files in whatever format your process requires.

When the work is more than the hours, the choice is usually turning projects away or making a permanent hire for a workload that fluctuates. Design Support is the third option: extra design and calculation capacity that plugs into your workflow, under your review and your engineer of record’s seal, and scales back down when the workload normalizes.
For a Design-Build consulting firm managing MEP coordination across a mixed-use commercial project, Excelize’s team developed the MEP design model and supporting code calculations from 0% DD through plan-check, working under the firm’s engineer of record for final review and seal, freeing the in-house team to take on two additional active projects during the same period.
“Their attention to detail and ability to deliver under tight deadlines is unmatched.”

Software
A specific project, a busy season, or an ongoing capacity gap each shape how this gets scoped. Send us where things stand, and a sample comes back in 2 to 3 days.
MEP system design, drafting, constructability, and coordination through plan-check.
ExploreDedicated HVAC modeling and coordination once the load calculations are set.
ExploreFederated multi-trade coordination and clash resolution at the project level.
Explore