
BIM Services
Concept to fabrication — coordinated Revit models, clash-free federated files and drawing sets your field crews can build from.
All services
BIM insights, how-tos and industry deep dives for AEC teams.
Free downloadable guides for precon, VDC and BIM leaders.
Monthly BIM insights and project lessons in your inbox.
ROI Calculator and ISO 19650 readiness checklist.
Real projects with results in numbers, across five verticals.
Model demos and project explainers.
Step-by-step model and project walkthroughs.
What Is BIM Coordination? Clash Detection, LOD, and the Federated Model Explained
In-House BIM Team vs Outsourcing: What It Actually Costs a U.S. Firm
ISO 19650 Explained: What U.S. AEC Firms Need to Know Before Their Next Bid
Read more40-Story Office Tower, Dallas — 12 Trades Coordinated Clash-Free
420,000 sq ft of Class A commercial delivered at LOD 350 — full coordination, clash resolution and model-linked quantity takeoffs across every discipline.
Get to know how, since 2004, Excelize grew into the BIM partner U.S. AEC firms trust — 300+ clients served and 2,500+ projects delivered end to end.
Learn MoreHow We Work
Trust
Careers
These terms set out how Excelize Software Pvt. Ltd provides BIM and design-support services, what we are responsible for, and what we ask of you. Where a signed agreement exists, that agreement takes precedence.
Last updated: August 2026These Terms of Service govern your use of this website and any BIM, drafting, coordination, or design-support services provided by Excelize Software Pvt. Ltd (“Excelize”, “we”, “us”). By using this website or engaging our services, you agree to these terms.
Where a signed proposal, master services agreement, or purchase order exists between you and Excelize, that document governs the engagement and takes precedence over these terms wherever the two differ.
Excelize provides production and support services to architecture, engineering, and construction firms, including 3D BIM modeling, multi-trade coordination and clash detection, shop, fabrication and spool drawings, quantity takeoffs, scan-to-BIM, and design support.
Scope, deliverables, level of development, file formats, and timelines are defined per engagement in the applicable proposal or BIM execution plan.
To deliver on schedule, we rely on you to provide:
Delays in providing inputs or approvals may shift agreed delivery dates.
Excelize is not the engineer of record, architect of record, or a licensed design professional in any U.S. jurisdiction.
All deliverables are prepared as production support for review, approval, and where applicable, sealing by your licensed professional. Final responsibility for design intent, code compliance, and construction means and methods remains with you.
Fees, rates, and billing cycles are set out in the applicable proposal or engagement model. Unless otherwise agreed in writing, invoices are payable within the terms stated on the invoice.
Work performed beyond the agreed scope is quoted and approved separately before it begins.
On full payment, deliverables produced specifically for your project become your property, together with any rights required to use them for that project.
Excelize retains ownership of its own templates, scripts, libraries, internal tools, methodologies, and general know-how, including any improvements developed while performing the work. Nothing in an engagement transfers these to you.
Website content, brand marks, and design remain the property of Excelize and may not be reproduced without written permission.
Project information you share is treated as confidential and used only to perform the engagement. We restrict access to personnel working on your project and require the same obligation of them.
Where a separate non-disclosure agreement is in place, that agreement applies. We do not publish project names, images, or details as case studies or marketing material without your written consent.
We perform services with the skill and care reasonably expected of an experienced BIM production provider, and we correct errors in our deliverables that are reported within the review period stated in the engagement.
Beyond this, the website and its content are provided “as is” without warranties of any kind, express or implied, including fitness for a particular purpose. Deliverables depend on the accuracy and completeness of the inputs supplied to us.
To the maximum extent permitted by law, Excelize is not liable for indirect, incidental, or consequential losses, including lost profits, lost bids, delay costs, or rework costs arising outside our deliverables.
Our total aggregate liability for any engagement is limited to the fees paid to Excelize for that engagement.
Either party may terminate an engagement by written notice on the terms set out in the applicable agreement. On termination you remain responsible for fees for work completed and work in progress up to the termination date, and we will hand over completed deliverables once those amounts are settled.
These terms are governed by the laws of India, and the courts of Mumbai, Maharashtra have jurisdiction, unless a signed agreement between you and Excelize provides otherwise.
We may update these terms from time to time. The version published on this page at the time of your engagement applies. Questions about these terms can be sent to us: