Excelize
Company
Story
Excelize team

Get to know how, since 2004, Excelize grew into the BIM partner U.S. AEC firms trust — 300+ clients served and 2,500+ projects delivered end to end.

Learn More
Book a Consultation

BIM Detailing and Shop Drawing Services for U.S. Subcontractors

Coordinated shop drawings, fabrication drawings, and spool sheets that keep your crews ahead of schedule and clear the BIM requirements that more GCs are putting in front of you.

When your detailing falls behind, your fabrication shop and your field crews both wait. Every GC that now requires BIM is one more qualification you have to clear just to win the work. Excelize performs as your extended detailing team. We coordinate with the construction model and your standards, so your shop drawings and spools are ready before the crews are.

2004Building BIM since
NJ · CAU.S. offices — New Jersey & California
Revit · TeklaDetailed in Revit, Tekla & AutoCAD
2,500+Projects delivered
Model-firstCoordinated to the construction model
See how we help subcontractors
Built for trade subs & fab shops What we deliver
The Detailing Squeeze

Your crews move only as fast as your detailing.

Detailing is where the schedule is won or lost. When shop drawings lag, fabrication stalls and the field waits, and more GCs will not shortlist a sub who cannot deliver coordinated BIM. Excelize gives you detailing capacity on demand. We scale up for a big award and scale back down once it ships, so you never carry the cost in between.

Construction hiring — BIM talent shortage
92% of U.S. construction firms report they can't fill the roles they already have open
Sound familiar?
BIM quantity takeoff extraction from structural model
01Fab stallsField waits

Detailing behind schedule

Shop & field waiting

Holding up your fabrication shop and your field crews.

Navisworks-style clash detection — duct and steel beam conflict
02ShortlistsSub terms

BIM now required

Qualification bar

To qualify for and win the work you want.

Multiple federated BIM models overlapping
03Site clashesScrap

Coordination rework

Found on site

Clashes found on site that should have been caught in the model.

Complete federated BIM model with color-coded MEP systems
04CapacityNext award

Detailing team maxed out

No room to grow

With no room to take on the next award.

What We Deliver

Detailing your shop can build, on your standards.

Shop & fabrication drawings

Trade shop drawings and fabrication-ready drawings detailed to your standards and the construction model, issued in your formats.

Explore Shop Drawings

Sheet-metal & duct fabrication

Ductwork laid out and detailed for fabrication, with cut sheets and bills of material your shop can run straight to the floor.

Explore Fabrication Drawings

Pipe spool & process piping

Spool drawings, isometrics, and cut lists for mechanical, plumbing, and process piping, coordinated and fabrication-ready.

Explore Spool Drawings

2D coordination drawings

Sign-off coordination drawings tied to the federated construction model, so your scope is clash-free before anything is cut.

Explore 2D Coordination

Connection & misc. metals detailing

Steel connection detailing and miscellaneous metals modeled in Tekla to your engineer’s connection design, ready for the shop.

Explore Steel Detailing

Scan-to-BIM for field verification

Point cloud and laser-scan data modeled so your detailing matches as-built conditions before fabrication starts.

Explore Scan to BIM
Tuned to Your Trade

Detailing tuned to your trade.

We detail and coordinate for the U.S. trades that live or die by their fabrication schedule.

Mechanical and sheet metal

Mechanical & sheet metal

Ductwork, equipment, and hangers are detailed for fabrication and coordinated with the construction model.

DuctworkHangersCut sheets
Mechanical and process piping

Mechanical & process piping

Spools, isometrics, and supports for piping, plumbing, and process work, fabrication-ready and clash-checked.

SpoolsIsometricsSupports
Fire protection

Fire protection

Sprinkler layouts and fabrication drawings coordinated trade to trade and built to your standards.

SprinklerNFPA 13Trade-to-trade
Steel and misc metals

Steel & misc. metals

Connection detailing and miscellaneous metals modeled in Tekla to your engineer’s connection design.

TeklaConnectionsMisc. metals
Inside Your Shop

How our detailing team works inside your shop.

Autodesk Revit AutoCAD Autodesk BIM 360 Tekla Autodesk Navisworks
1

Your environment

We detail in your tools — Revit, Tekla, AutoCAD or CADmep — to your standards, templates, and the GC’s BIM execution plan.

2

Coordinated with the construction model

We work to the federated model and the GC’s coordination process, so your scope is clash-free before fabrication.

3

U.S. hours, nationwide coverage

Detailers work U.S. hours out of our New Jersey and California offices, supporting subcontractors on projects across every U.S. state.

4

Embedded in 48 hours

A detailer or pod is on your project within two days, not the weeks an in-house hire takes to ramp up.

Exploded BIM model
5

QA/QC’d before it reaches you

Every drawing set runs through a documented checklist and automated check, so your team approves the work instead of redoing it.

6

Secure by default

We work inside your environment under NDA. Every model, drawing, and template we build is delivered to you.

Coordinated detailing keeps the shop running.

Send us a live U.S. package, and see the shop-drawing quality on your own scope before you decide anything.

The Business Case

The real cost of detailing that runs late.

For a fabricator, a late or uncoordinated detail is not just a drawing problem. It is a scrap problem and a field-rework problem. Material cut to a clash gets cut twice, and a crew sent to install against a bad model loses the day. More GCs are writing BIM deliverables directly into subcontract terms on commercial, healthcare, and datacenter work, which means a sub who cannot deliver coordinated detailing gets passed over for one who can.

The cheapest detailer rarely wins in the end. If your shop foreman spends half the week reworking a low-cost vendor’s drawings, the savings are already on the floor as scrap. Excelize is built for the opposite outcome: coordinated detailing that comes back fabrication-ready the first time, so your shop runs and your crews stay ahead.

1st time annual cost of rework in U.S. construction
48-hr embed time — detailer or pod on your project
2,500+ projects delivered since 2004
Related Resources

Three ways to bring Excelize onto your next package.

Free Sample First

Send a real U.S. package or model. We return a coordinated shop-drawing sample, detailed to your standards, in 2 to 3 days.

Best to judge the work before any commitment Get a Free Sample →

Project-Based

A defined scope and fixed deliverables, detailed to your standards and the GC’s BEP, for a specific U.S. award.

Best for shop drawings, fabrication drawings, or spools Scope a Project →
FAQs

BIM detailing FAQs for subcontractors & fabricators.

Straight answers on software, trades, fabrication output, and how fast we can start.

Still have questions? Talk to a BIM Lead
We detail in Revit, Tekla, and AutoCAD or CADmep, or your own platform, and deliver in your formats, including RVT, DWG, IFC, and the fabrication exports your shop runs.
Yes. We work to the federated construction model and the GC’s BIM execution plan, so your scope is clash-free and your drawings clear the GC’s coordination process.
Mechanical and sheet metal, process and plumbing piping, fire protection, and steel and miscellaneous metals, with fabrication drawings, spools, and cut sheets your shop can build from.
Yes. We deliver shop and fabrication drawings, sheet-metal and duct fabrication drawings, pipe spool drawings, cut sheets, and bills of material ready for the shop floor.
No. We model connections to your engineer’s connection design and detail to your standards. Connection design and engineering stay with your engineer of record.
No. Our offices are in New Jersey and California, but our detailing teams support subcontractors and fabricators on projects across the United States.
A detailer or pod can be embedded on your project within 48 hours, and productive in the first week because we already work with your tools and standards.
We work inside your environment under NDA. The models, drawings, and templates we build are delivered to you, never reused or held back.

Send us a real package. See the detailing quality first.

Share a scope or a model. We’ll return a coordinated shop-drawing sample, detailed to your standards, in 2 to 3 days, so you can judge the work before you commit to anything.

  • No contract
  • No obligation
  • Your details and your IP stay yours