
BIM Services
Concept to fabrication — coordinated Revit models, clash-free federated files and drawing sets your field crews can build from.
All services
BIM insights, how-tos and industry deep dives for AEC teams.
Free downloadable guides for precon, VDC and BIM leaders.
Monthly BIM insights and project lessons in your inbox.
ROI Calculator and ISO 19650 readiness checklist.
Real projects with results in numbers, across five verticals.
Model demos and project explainers.
Step-by-step model and project walkthroughs.
What Is BIM Coordination? Clash Detection, LOD, and the Federated Model Explained
In-House BIM Team vs Outsourcing: What It Actually Costs a U.S. Firm
ISO 19650 Explained: What U.S. AEC Firms Need to Know Before Their Next Bid
Read more40-Story Office Tower, Dallas — 12 Trades Coordinated Clash-Free
420,000 sq ft of Class A commercial delivered at LOD 350 — full coordination, clash resolution and model-linked quantity takeoffs across every discipline.
Get to know how, since 2004, Excelize grew into the BIM partner U.S. AEC firms trust — 300+ clients served and 2,500+ projects delivered end to end.
Learn MoreHow We Work
Trust
Careers
We break your piping into fabrication-ready spools. Isometrics, cut lists, and weld maps that your shop can build and your field can install.
Prefabricating pipe in the shop, instead of welding it in the field, is where the schedule and the margin are. Excelize breaks your coordinated piping model into spools your shop can build and your crew can install.
A pipe spool is a prefabricated section of piping, built in the shop and installed as a unit. A spool drawing is the instruction set for that piece: the isometric, the dimensions, the materials, and the welds. Excelize breaks coordinated piping models into spools for U.S. mechanical, plumbing, and process contractors, with isometrics and cut lists ready for fabrication.
Each spool drawn as a clear isometric with dimensions and materials.
Pipe, fittings, and material lists per spool, pulled from the model.
Shop and field welds identified and mapped.
A numbering system your shop and field can track.
Spooled from piping coordinated to the construction model.
Checked against the model and your standards before issue.
We confirm the coordinated piping model, your spec, and your numbering.
Piping broken into shop-buildable, shippable spools.
Each spool drawn with materials, welds, and a cut list.
Checked against the model and your standards.
Delivered fabrication-ready, numbered and tagged.
Revit and AutoCAD, with Navisworks for coordination.

Your piping spec, shop standards, and U.S. code requirements.
Mechanical, plumbing, and process piping.
DWG and PDF isometrics, with cut lists in Excel.
Built for the U.S. piping trades:

Hydronic, steam, and HVAC piping spooled for fab.

Domestic water, waste, and vent spooled and tagged.

Process piping with weld maps and material control.

Sprinkler piping spooled where prefabrication helps.

Send a coordinated piping model. We’ll spool a sample run with isometrics and a cut list in 2 to 3 days, so you see the quality before you commit.
Field welding is slow, costly, and weather-dependent. Move that work to the shop and you cut hours, control quality, and protect the schedule. Spool drawings are what make it possible, clear, numbered, and coordinated, so the right piece shows up ready to install.
Send a coordinated piping model. We spool a sample run with isometrics and a cut list in 2 to 3 days.
Get a Free Sample →A named detailer embedded month to month, scaled to your backlog.
Talk to a BIM Lead →A defined scope and fixed deliverables, spooled to your spec and numbering.
Scope a Project →Pricing is scoped to the work, by the project or by the month. No long-term lock-in.
2,500+ projects across mechanical, plumbing, and process piping.
Real offices in New Jersey and California, spooled to your spec.
Spools broken from a coordinated construction model.
We work under NDA; every drawing is delivered to you.
You own the outcome. We own the production.

Send a coordinated piping model and we’ll spool a sample run with isometrics and a cut list in 2 to 3 days, so you can judge the quality before you commit.