Excelize
Company
Story
Excelize team

Get to know how, since 2004, Excelize grew into the BIM partner U.S. AEC firms trust — 300+ clients served and 2,500+ projects delivered end to end.

Learn More
Book a Consultation
/ Who We Help

BIM Services by Role for U.S. AEC Firms

One BIM partner, built around your role on the project, for general contractors, architects, MEP engineers, and subcontractors.

The right BIM deliverable depends on your role on the project. Excelize delivers exactly what each role needs, working inside your tools, your standards, and your code, as an extension of your team, not a vendor you have to manage.

2004Building BIM since
2U.S. offices — New Jersey & California
2,500+Projects delivered
300+Clients
Find your role
One partner for every role on the project Choose your role
Find Your Role

One partner built around how your firm works.

What you need from BIM

Clash-free coordination, fast takeoffs, and a model the field can actually build from.

Your role on the project
What Excelize delivers
Coordination & clash detection
Model-linked QTOs
4D phasing
Scan-to-BIM
Preconstruction support
A single coordinated model your trades, estimators, and field teams all work from. Explore BIM for GCs →
What you need from BIM

Documents that carry your standards, so your senior staff stay free to design.

Your role on the project
What Excelize delivers
Revit modeling
CD sets
Custom Revit families & templates
3D visualization
Scan-to-BIM
We work inside your templates and standards, as a production extension of your studio. Explore BIM for Architects →
What you need from BIM

Models and calcs that survive review, keeping your PEs focused on engineering.

Your role on the project
What Excelize delivers
MEP/F modeling
HVAC system BIM
Coordination
Design support
Calcs you review & seal
Your PEs review and seal; we carry the modeling and coordination load. Explore BIM for MEP →
What you need from BIM

Shop and fabrication drawings coordinated to the construction model, issued in your formats.

Your role on the project
What Excelize delivers
Shop drawings
Fabrication & sheet-metal drawings
Pipe spool drawings
2D coordination drawings
Shop, fabrication, sheet-metal and pipe-spool drawings, plus 2D coordination drawings — all coordinated to the construction model and issued in your formats. Explore BIM for Subcontractors →
Choose Your Role

Built for the way your role works.

For General Contractors and Construction Managers

You're winning more than your VDC team can model, and late takeoffs and field clashes hit your margin and your bid rate. We run as your extended VDC bench, inside your execution plan and your LOD.

What we deliver

Multi-trade coordination and clash detection in Navisworks, model-linked quantity takeoffs, 4D phasing and site logistics, scan-to-BIM, and preconstruction support, to AIA G202 LOD.

Explore BIM for General Contractors

For Architecture Firms

CD deadlines and fixed fees are squeezing the studio, and senior architects are drawing sheets instead of designing. We extend your production to your templates and standards, so the work looks like your firm drew it.

What we deliver

Revit modeling from schematic through CDs, full CD sets, custom Revit families and template libraries, 3D visualization, and scan-to-BIM for existing conditions.

Explore BIM for Architecture Firms

For MEP and Fire-Protection Engineering Firms

Your modeling backlog is keeping licensed engineers in drafting. We take the production load so your PEs stay on engineering. The line is clear: we model and prepare calculations; your engineer of record reviews, seals, and stamps.

What we deliver

Mechanical, electrical, plumbing, and fire-protection modeling; HVAC system BIM; coordination and clash detection; and design support with load and sizing calculations for your engineer's review and seal.

Explore BIM for MEP Engineering Firms

For Trade Subcontractors and Fabricators

Your crews move only as fast as your detailing, and more GCs now require BIM to qualify. We keep your detailing ahead of schedule, coordinated to the construction model, so what you fabricate fits the field the first time.

What we deliver

Shop drawings, fabrication and sheet-metal drawings, pipe spool drawings, and 2D coordination drawings, coordinated to the construction model and issued in your formats.

Explore BIM for Subcontractors

Every role across the sectors U.S. AEC firms build

Whatever your role, we deliver BIM modeling, coordination, and drawings across the sectors where U.S. general contractors, architects, and MEP engineers work:

Commercial and mixed-use

Commercial & mixed-use

Office, retail, and mixed-use towers, coordinated from design intent through CD-ready BIM.

OfficeRetailMixed-use towers
Healthcare and labs

Healthcare & labs

Code-heavy, MEP-dense buildings modeled and clash-coordinated to high LOD for U.S. clients.

HospitalsLabsHigh LOD
Data centers and industrial

Data centers & industrial

Mission-critical and process builds with heavy mechanical and electrical, coordinated for fabrication.

Mission-criticalFabrication-ready
Education and public work

Education & public work

Multi-phase, standards-driven projects for U.S. institutions and public owners.

InstitutionsPublic ownersMulti-phase
Why Excelize

Onshore accountability. Offshore scale.
One partner for every role.

Onshore accountability

Real U.S. offices in New Jersey and California, built to U.S. standards since 2004.

Built to your standards

We work in your tools and run a documented QA check on every deliverable, so your team reviews the work instead of redoing it.

Your IP stays yours

Secure common data environment, NDA, and every model, family, and template delivered to you.

You own the outcome. We own the production.

Since 2004Building BIM
2,500+Projects delivered
300+Clients
48 hoursTo embed with your team
Related Resources

Not sure where you fit? Start with a free sample.

Send us a set of drawings. We'll return a coordinated sample, modeled to your standards, in 2 to 3 days, so you can judge the quality before you commit.

No contract. No obligation. Your files and your IP stay yours.