BIM Services
Concept to fabrication — coordinated Revit models, clash-free federated files and drawing sets your field crews can build from.
All services
BIM Consulting
Standards, workflows and ISO 19650 processes that make BIM repeatable across every project your firm takes on.
All services
Staffing & Design Support
Trained modelers and engineers working in your time zone, to your standards — scale up in days, not hiring cycles.
BIM Staffing
Design Support
BIM insights, how-tos and industry deep dives for AEC teams.
Free downloadable guides for precon, VDC and BIM leaders.
Monthly BIM insights and project lessons in your inbox.
ROI Calculator and ISO 19650 readiness checklist.
Real projects with results in numbers, across five verticals.
Walkthroughs, model demos and project explainers.
What Is BIM Coordination? Clash Detection, LOD, and the Federated Model Explained
In-House BIM Team vs Outsourcing: What It Actually Costs a U.S. Firm
ISO 19650 Explained: What U.S. AEC Firms Need to Know Before Their Next Bid
Read more40-Story Office Tower, Dallas — 12 Trades Coordinated Clash-Free
420,000 sq ft of Class A commercial delivered at LOD 350 — full coordination, clash resolution and model-linked quantity takeoffs across every discipline.
Get to know how, since 2004, Excelize grew into the BIM partner U.S. AEC firms trust — 300+ clients served and 2,500+ projects delivered end to end.
Learn MoreWho We Are
How We Work
Trust
Careers
Existing conditions verified before design starts, live utility tie-ins sequenced before service interruption is a risk, documentation built for multi-agency review in Pennsylvania and beyond.
Infrastructure facilities, pump stations, treatment plants, substations, transit stations, carry a coordination risk that ground-up buildings don’t. Most sit on a site with decades of undocumented modification. Most have to keep running while the retrofit happens around them. Excelize scopes infrastructure facility BIM around both constraints.
Infrastructure owners, and the GCs and MEPF firms bidding their retrofit work, increasingly require existing-conditions verification as a gating requirement before a coordination partner is considered, since original drawings for a decades-old treatment plant or substation rarely match what's actually built. A firm without a Scan to BIM-based existing-conditions process isn't offering a cheaper option. It's proposing to coordinate against drawings nobody trusts.
That bar exists because a tie-in coordinated against inaccurate existing conditions doesn't fail quietly. A live utility connection cut or rerouted based on a wrong as-built becomes a service interruption, not an RFI.
Excelize scopes infrastructure engagements around verified existing conditions first, coordination second, not the reverse.
A tie-in or clash caught in the federated model at Design Development is a coordination adjustment. The same conflict, discovered after a live utility connection is already cut, is a service interruption, not a change order, on a facility a community, a hospital, or a transit line may depend on continuously.
Establishing an accurate as-built federated model before retrofit coordination design begins.
For treatment, pumping, and utility facility buildings, confirming piping, electrical, and mechanical systems clear structure at LOD 300.
Sequencing new connections against existing, active utility infrastructure to confirm no service interruption during construction.
LOD 300 through Design Development, extracted to LOD 350 for construction documentation supporting multi-agency permitting.
Confirms the Scan to BIM capture matches field conditions before any new design coordination is layered on top of it.
Validates every new connection against the active system it's tying into, run jointly with the facility owner's operations team where a live system is involved.
Generating the specific submittal sets required by the reviewing authorities, water authority, transit agency, public works, directly from the coordinated model.
A tie-in coordinated against inaccurate existing conditions doesn't fail quietly, so verified conditions come before any new design coordination is layered on top.
A tie-in or clash caught in the federated model at Design Development is a coordination adjustment. The same conflict, discovered after a live utility connection is already cut, is a service interruption, not a change order, on a facility a community, a hospital, or a transit line may depend on continuously.
BIM and coordination workflows aligned with ISO 19650 information management principles, a working methodology, not a certification.
Existing-conditions verification for utility, treatment, and transit facility retrofits; live utility tie-in sequencing; multi-agency documentation support.
2,500+ BIM projects delivered since 2004.
U.S. presence: offices in New Jersey and California, project experience concentrated in TX, FL, NY, NJ, CA, PA. Documentation: insurance certificates, MSA terms, and process references available as part of your qualification process.
A tie-in error found after the connection is live isn’t a coordination fix. It’s a service interruption. Verify existing conditions before the design starts.