BIM Services
Concept to fabrication — coordinated Revit models, clash-free federated files and drawing sets your field crews can build from.
All services
BIM Consulting
Standards, workflows and ISO 19650 processes that make BIM repeatable across every project your firm takes on.
All services
Staffing & Design Support
Trained modelers and engineers working in your time zone, to your standards — scale up in days, not hiring cycles.
BIM Staffing
Design Support
BIM insights, how-tos and industry deep dives for AEC teams.
Free downloadable guides for precon, VDC and BIM leaders.
Monthly BIM insights and project lessons in your inbox.
ROI Calculator and ISO 19650 readiness checklist.
Real projects with results in numbers, across five verticals.
Walkthroughs, model demos and project explainers.
What Is BIM Coordination? Clash Detection, LOD, and the Federated Model Explained
In-House BIM Team vs Outsourcing: What It Actually Costs a U.S. Firm
ISO 19650 Explained: What U.S. AEC Firms Need to Know Before Their Next Bid
Read more40-Story Office Tower, Dallas — 12 Trades Coordinated Clash-Free
420,000 sq ft of Class A commercial delivered at LOD 350 — full coordination, clash resolution and model-linked quantity takeoffs across every discipline.
Get to know how, since 2004, Excelize grew into the BIM partner U.S. AEC firms trust — 300+ clients served and 2,500+ projects delivered end to end.
Learn MoreWho We Are
How We Work
Trust
Careers
High-bay racking clearances validated in Texas distribution centers, phased retrofits coordinated around live production lines in New Jersey, before a shutdown window ever gets scheduled.
A ground-up distribution center and a live manufacturing plant retrofit don’t share a single coordination risk. One is racking clearance and structural steel. The other is a production line that can’t stay down past its approved shutdown window. Excelize scopes industrial BIM around that difference.
Manufacturers and logistics operators increasingly require documented experience coordinating BIM around an operating production line before a firm is even considered for a retrofit, since a shutdown window is usually measured in hours, not weeks. A firm without phased-shutdown coordination experience isn't priced out. It's removed from the shortlist before scope gets discussed.
That bar exists because an industrial retrofit doesn't get to pause and fix a coordination error mid-shutdown. A structural or process clash found after the line goes down costs production hours the client is already losing money on, not schedule float.
Excelize scopes industrial engagements around this reality: retrofit coordination isn't ground-up construction on a tighter schedule. It's a different discipline built around live operational constraints.
A structural or process clash resolved in the federated model at Design Development is a coordination adjustment. The same clash found after a scheduled shutdown starts is a different problem entirely: the window doesn't extend to accommodate a fix, so the line either restarts with an unresolved conflict, or the shutdown runs over, and every hour past the approved window costs the client lost production, not just contractor rework.
Confirming rack, crane, and structural steel clearances at LOD 300 before racking systems are ordered.
Integrating equipment vendor drawings into the federated model to confirm conveyor, tank, and process piping runs clear structural and MEPF systems.
Checking overhead crane runway and material-handling paths against structure and MEPF before installation.
LOD 300 through Design Development, advancing to LOD 400 fabrication-ready models for prefabricated structural steel and process piping spool packages.
Runs the coordinated model against the actual shutdown schedule, confirming every tie-in and demolition sequence fits inside the approved window before it's finalized.
Integrates vendor-supplied equipment drawings into the federated model as they arrive, so a late submittal doesn't invalidate coordination already completed around it.
Using Scan to BIM captures accurate as-built conditions before retrofit coordination begins, since facilities modified over years rarely match their original drawings.
A shutdown window doesn't extend to accommodate a fix, so coordination has to be validated before the line goes down, not during it.
A structural or process clash caught in the federated model at Design Development is a coordination adjustment. The same clash found during a scheduled shutdown is a different problem entirely. The shutdown window doesn't extend to accommodate a fix, so the line either restarts with an unresolved conflict, or the shutdown runs over, and every hour past the approved window costs the client lost production, not just contractor rework.
BIM and coordination workflows aligned with ISO 19650 information management principles, a working methodology, not a certification.
Ground-up distribution and manufacturing facilities, phased retrofit coordination around live production lines, existing-conditions verification via Scan to BIM.
2,500+ BIM projects delivered since 2004.
U.S. presence: offices in New Jersey and California, project experience concentrated in TX, FL, NY, NJ, CA, PA. Documentation: insurance certificates, MSA terms, and process references available as part of your qualification process.
A coordination error found mid-shutdown doesn’t get schedule float. It gets a production line that’s down longer than approved. Get the model validated before the shutdown window opens.