BIM Services
Concept to fabrication — coordinated Revit models, clash-free federated files and drawing sets your field crews can build from.
All services
BIM Consulting
Standards, workflows and ISO 19650 processes that make BIM repeatable across every project your firm takes on.
All services
Staffing & Design Support
Trained modelers and engineers working in your time zone, to your standards — scale up in days, not hiring cycles.
BIM Staffing
Design Support
BIM insights, how-tos and industry deep dives for AEC teams.
Free downloadable guides for precon, VDC and BIM leaders.
Monthly BIM insights and project lessons in your inbox.
ROI Calculator and ISO 19650 readiness checklist.
Real projects with results in numbers, across five verticals.
Walkthroughs, model demos and project explainers.
What Is BIM Coordination? Clash Detection, LOD, and the Federated Model Explained
In-House BIM Team vs Outsourcing: What It Actually Costs a U.S. Firm
ISO 19650 Explained: What U.S. AEC Firms Need to Know Before Their Next Bid
Read more40-Story Office Tower, Dallas — 12 Trades Coordinated Clash-Free
420,000 sq ft of Class A commercial delivered at LOD 350 — full coordination, clash resolution and model-linked quantity takeoffs across every discipline.
Get to know how, since 2004, Excelize grew into the BIM partner U.S. AEC firms trust — 300+ clients served and 2,500+ projects delivered end to end.
Learn MoreWho We Are
How We Work
Trust
Careers
Multi-trade clash detection, model-based takeoffs, and 4D phasing, built inside your BIM execution plan, so your trades build from a clean, coordinated model.
Winning more bids than your VDC team can model creates a real problem. Coordination slips. Takeoffs run late. Both show up in the field as RFIs, change orders, and margin you do not get back. Excelize performs as your extended VDC bench. We coordinate to your standards, so the model your trades build from stays clean.
When three pursuits and two active jobs all need coordination in the same week, hiring is not the answer. Recruiting takes months, and the deadline is days away. Excelize gives you BIM capacity on demand. We scale up for a pursuit and scale down once it closes, so you never carry the cost in between.

Slowing your estimates and your bid turnaround.

Conflicts that should have been caught in the model.

Under pursuit volume with no room to scale.

To qualify for the work you want to win.
We federate architectural, structural, and MEPF models and run clash detection to resolution in Navisworks. Coordination runs at LOD 350, so conflicts get solved in the model, not the field.
Explore BIM CoordinationQuantities are pulled directly from the model, which makes your estimates faster and more defensible. The numbers stay consistent as the design changes.
Explore Quantity TakeoffsConstruction sequencing and site logistics are tied to your schedule, so you can plan the build, present it clearly, and reduce risk before it starts.
Explore 4D BIMPoint cloud and laser-scan data become an accurate existing-conditions model, built for renovation, addition, and tie-in work.
Explore Scan to BIMWe work as a trained extension of your team on constructability reviews, trade coordination, and BIM execution planning through preconstruction.
Explore BIM ConsultingWe run the same multi-trade coordination and clash detection across the building types U.S. general contractors build most often. Every project is coordinated with the codes and AHJ requirements for its state and city.
Tight cores, repetitive floors, and aggressive bid schedules define this building type. We coordinate the riser and ceiling zones early, so a clash on the typical floor gets solved once instead of repeating up the stack.
Some of the most congested ceilings in construction. Med-gas lines, hangers, and above-ceiling MEPF systems get coordinated to LOD 350, so conflicts are resolved in the model rather than over an occupied floor.
Heavy mechanical and electrical scope defines these schedule-critical builds. We model and clash the distribution systems, so your trades fabricate from a clean, stable set instead of a moving target.
These are multi-phase, occupied-campus jobs with strict standards. We work to your BEP and the owner’s BEP, and keep the existing-conditions model accurate for every tie-in.
We work inside your CDE, whether that is Autodesk Construction Cloud, BIM 360, or your own platform, to your BEP, templates, and LOD.
Coordinators work U.S. hours out of our New Jersey and California offices, across every U.S. state and time zone.
A coordinator or pod joins your project within two days, not the weeks an in-house hire takes to ramp up.
We join your OAC and trade calls, track and report issues, and give you a named point of contact, never a black box.
Every deliverable runs through a documented checklist and automated check, so your team reviews the work instead of redoing it.
We work inside your CDE under NDA. Every model, family, and template we build is delivered to you; your data and IP stay yours.
MSA, insurance, and company details are available whenever your vendor onboarding needs them.
Send us a live U.S. project, and see the coordination quality on your own drawings before you decide anything.
Poor coordination is one of the most expensive habits in construction. Rework driven by bad data and miscommunication costs the U.S. industry an estimated $31.3 billion a year. Run the process the other way, and the return is just as real. One documented program turned a $200,000 investment in clash detection into roughly $2.5 million in avoided cost, close to a 10x return.
The cheapest rate rarely wins in the end. If a senior estimator or VDC lead spends half their week fixing a low-cost vendor's output, the savings disappear fast. Excelize is built for the opposite outcome: work that comes back right the first time, so your best people stay on the work only they can do.
Send a real U.S. set or model. We return a coordinated sample, modeled to your standards, in 2 to 3 days.
Best to judge the work before any commitment Get a Free Sample →A named coordinator or pod embedded month to month. Capacity scales up for pursuits and down once they close.
Best for GCs with an ongoing pipeline Talk to a BIM Lead →A defined scope and fixed deliverables, run inside your CDE and to your BEP, for a specific U.S. job.
Best for coordination, takeoffs, or scan-to-BIM scope Scope a Project →Straight answers on software, LOD, takeoffs, data, and how fast we can start.
Still have questions? Talk to a BIM Lead
Share a live U.S. set or model. We’ll return a coordinated sample to your standards in 2 to 3 days, so you can judge the quality before you decide anything.