BIM Services
Concept to fabrication — coordinated Revit models, clash-free federated files and drawing sets your field crews can build from.
All services
BIM Consulting
Standards, workflows and ISO 19650 processes that make BIM repeatable across every project your firm takes on.
All services
Staffing & Design Support
Trained modelers and engineers working in your time zone, to your standards — scale up in days, not hiring cycles.
BIM Staffing
Design Support
BIM insights, how-tos and industry deep dives for AEC teams.
Free downloadable guides for precon, VDC and BIM leaders.
Monthly BIM insights and project lessons in your inbox.
ROI Calculator and ISO 19650 readiness checklist.
Real projects with results in numbers, across five verticals.
Walkthroughs, model demos and project explainers.
What Is BIM Coordination? Clash Detection, LOD, and the Federated Model Explained
In-House BIM Team vs Outsourcing: What It Actually Costs a U.S. Firm
ISO 19650 Explained: What U.S. AEC Firms Need to Know Before Their Next Bid
Read more40-Story Office Tower, Dallas — 12 Trades Coordinated Clash-Free
420,000 sq ft of Class A commercial delivered at LOD 350 — full coordination, clash resolution and model-linked quantity takeoffs across every discipline.
Get to know how, since 2004, Excelize grew into the BIM partner U.S. AEC firms trust — 300+ clients served and 2,500+ projects delivered end to end.
Learn MoreWho We Are
How We Work
Trust
Careers
MEPF routing, structural clearance, and FF&E validated against both code and brand standards before fit-out begins.
A hospitality project answers to two authorities at once, building code and the brand standards document, and they don’t always agree. Excelize coordinates hospitality BIM to catch that conflict on screen, before it becomes a field substitution during fit-out.
A brand standards document sets guest room ceiling heights, fixture placement, and finish requirements independent of what a specific building’s structure and MEPF systems can actually accommodate. Code sets ADA clearances and life safety requirements independent of the brand document.
Most of the time, these two sets of requirements coexist without conflict. When they don’t, the conflict usually looks like this: a beam depth that eats into a brand-mandated ceiling height, or an FF&E placement that blocks a required clearance. It usually isn’t found until fit-out, when the FF&E is already ordered, and the installation crew is on site.
Excelize scopes hospitality engagements to check both requirements against the coordinated model before fit-out starts, not just one of them.
At that point, what was a simple model check becomes a site-level problem, discovered under time pressure instead of resolved on screen.
Confirming ductwork, sprinkler mains, and structural beams clear the ceiling height required by the brand standards document.
Checking furniture, fixture, and equipment placement against ADA clearance requirements and structural or MEPF elements before items are ordered.
Federated coordination through Design Development, extracted to LOD 350 for construction documentation once ceiling and FF&E conflicts are resolved.
Resolved once per room type and checked for consistency across repeating floors, similar in principle to a unit template but scoped to hospitality-specific brand and code requirements.
Runs the coordinated model against the brand standards document specifically, ahead of fit-out release, so a design that passes code review doesn’t move forward without also passing brand review.
Confirms the resolved room layout holds across every floor it repeats on, catching a ceiling or clearance conflict once instead of finding it room by room during installation.
Checks furniture and fixture placement against the coordinated model before procurement, not after items have shipped to site.
Because a hospitality project has two independent sets of requirements to satisfy, the review structure checks both, not just one.
A ceiling or FF&E conflict caught in the model at Design Development is a coordination adjustment. The same conflict found during fit-out is a field substitution under time pressure, a delay while a replacement gets sourced, and frequently a formal brand-standard exception that has to be documented and approved before the room can be signed off, on a project type where brand compliance is often a condition of the franchise agreement, not just a preference.
BIM and coordination workflows aligned with ISO 19650 information management principles, a working methodology, not a certification.
New-build and renovation hotel and resort projects, guest room typical coordination across repeating floors, franchise brand-standard compliance.
2,500+ BIM projects delivered since 2004.
U.S. presence: offices in New Jersey and California, project experience concentrated in TX, FL, NY, NJ, CA, PA. Documentation: insurance certificates, MSA terms, and process references available as part of your qualification process.
An FF&E conflict found during fit-out isn’t just a delay. It’s a brand-standard exception you now have to document and defend. Get both requirements checked before fit-out starts.