
BIM Services
Concept to fabrication — coordinated Revit models, clash-free federated files and drawing sets your field crews can build from.
All services
BIM insights, how-tos and industry deep dives for AEC teams.
Free downloadable guides for precon, VDC and BIM leaders.
Monthly BIM insights and project lessons in your inbox.
ROI Calculator and ISO 19650 readiness checklist.
Real projects with results in numbers, across five verticals.
Model demos and project explainers.
Step-by-step model and project walkthroughs.
What Is BIM Coordination? Clash Detection, LOD, and the Federated Model Explained
In-House BIM Team vs Outsourcing: What It Actually Costs a U.S. Firm
ISO 19650 Explained: What U.S. AEC Firms Need to Know Before Their Next Bid
Read more40-Story Office Tower, Dallas — 12 Trades Coordinated Clash-Free
420,000 sq ft of Class A commercial delivered at LOD 350 — full coordination, clash resolution and model-linked quantity takeoffs across every discipline.
Get to know how, since 2004, Excelize grew into the BIM partner U.S. AEC firms trust — 300+ clients served and 2,500+ projects delivered end to end.
Learn MoreHow We Work
Trust
Careers
One BIM partner, built around your role on the project, for general contractors, architects, MEP engineers, and subcontractors.
The right BIM deliverable depends on your role on the project. Excelize delivers exactly what each role needs, working inside your tools, your standards, and your code, as an extension of your team, not a vendor you have to manage.
Clash-free coordination, fast takeoffs, and a model the field can actually build from.

Documents that carry your standards, so your senior staff stay free to design.

Models and calcs that survive review, keeping your PEs focused on engineering.

Shop and fabrication drawings coordinated to the construction model, issued in your formats.


You're winning more than your VDC team can model, and late takeoffs and field clashes hit your margin and your bid rate. We run as your extended VDC bench, inside your execution plan and your LOD.
Multi-trade coordination and clash detection in Navisworks, model-linked quantity takeoffs, 4D phasing and site logistics, scan-to-BIM, and preconstruction support, to AIA G202 LOD.
Explore BIM for General ContractorsCD deadlines and fixed fees are squeezing the studio, and senior architects are drawing sheets instead of designing. We extend your production to your templates and standards, so the work looks like your firm drew it.
Revit modeling from schematic through CDs, full CD sets, custom Revit families and template libraries, 3D visualization, and scan-to-BIM for existing conditions.
Explore BIM for Architecture FirmsYour modeling backlog is keeping licensed engineers in drafting. We take the production load so your PEs stay on engineering. The line is clear: we model and prepare calculations; your engineer of record reviews, seals, and stamps.
Mechanical, electrical, plumbing, and fire-protection modeling; HVAC system BIM; coordination and clash detection; and design support with load and sizing calculations for your engineer's review and seal.
Explore BIM for MEP Engineering FirmsYour crews move only as fast as your detailing, and more GCs now require BIM to qualify. We keep your detailing ahead of schedule, coordinated to the construction model, so what you fabricate fits the field the first time.
Shop drawings, fabrication and sheet-metal drawings, pipe spool drawings, and 2D coordination drawings, coordinated to the construction model and issued in your formats.
Explore BIM for SubcontractorsWhatever your role, we deliver BIM modeling, coordination, and drawings across the sectors where U.S. general contractors, architects, and MEP engineers work:

Office, retail, and mixed-use towers, coordinated from design intent through CD-ready BIM.

Code-heavy, MEP-dense buildings modeled and clash-coordinated to high LOD for U.S. clients.

Mission-critical and process builds with heavy mechanical and electrical, coordinated for fabrication.

Multi-phase, standards-driven projects for U.S. institutions and public owners.
Real U.S. offices in New Jersey and California, built to U.S. standards since 2004.
We work in your tools and run a documented QA check on every deliverable, so your team reviews the work instead of redoing it.
Secure common data environment, NDA, and every model, family, and template delivered to you.
You own the outcome. We own the production.
Send us a set of drawings. We'll return a coordinated sample, modeled to your standards, in 2 to 3 days, so you can judge the quality before you commit.
No contract. No obligation. Your files and your IP stay yours.