
BIM Services
Concept to fabrication — coordinated Revit models, clash-free federated files and drawing sets your field crews can build from.
All services
BIM insights, how-tos and industry deep dives for AEC teams.
Free downloadable guides for precon, VDC and BIM leaders.
Monthly BIM insights and project lessons in your inbox.
ROI Calculator and ISO 19650 readiness checklist.
Real projects with results in numbers, across five verticals.
Model demos and project explainers.
Step-by-step model and project walkthroughs.
What Is BIM Coordination? Clash Detection, LOD, and the Federated Model Explained
In-House BIM Team vs Outsourcing: What It Actually Costs a U.S. Firm
ISO 19650 Explained: What U.S. AEC Firms Need to Know Before Their Next Bid
Read more40-Story Office Tower, Dallas — 12 Trades Coordinated Clash-Free
420,000 sq ft of Class A commercial delivered at LOD 350 — full coordination, clash resolution and model-linked quantity takeoffs across every discipline.
Get to know how, since 2004, Excelize grew into the BIM partner U.S. AEC firms trust — 300+ clients served and 2,500+ projects delivered end to end.
Learn MoreHow We Work
Trust
Careers
We produce BIM-based shop drawings your shop can build from. Coordinated to the construction model, detailed to your standards, and issued fabrication-ready.
Your crews move only as fast as your shop drawings. Excelize runs as your extended detailing team. We coordinate with the construction model and your standards, so your drawings are clear for review and your shop stays ahead of the schedule.
Shop drawings are the detailed drawings a trade contractor or fabricator builds from. They translate the design into exact, buildable instructions for a specific scope. Excelize produces BIM-based shop drawings for U.S. subcontractors and fabricators, coordinated to the construction model and detailed to your standards, across mechanical, plumbing, fire-protection, and structural trades.
Detailed, buildable drawings for your scope, issued in your formats.
Drawings generated from a model coordinated to the construction set, so they clear review.
Ductwork laid out and detailed for fabrication, with connections and supports.
Pipe runs, supports, and penetrations are detailed for the field.
Sprinkler layouts and shop drawings built to your standards.
Bills of material and schedules pulled from the model.
We confirm the construction set, your standards, and the GC’s BEP.
We model your scope and coordinate it to the construction model.
Shop drawings detailed to your standards, with BOMs and schedules.
Checked against the model and your standards before issue.
Delivered fabrication-ready, with a window for revisions.
Revit, Tekla, and AutoCAD, with Navisworks for coordination.

Your detailing standards, the GC’s BEP, and U.S. trade and code requirements.
Mechanical and sheet metal, piping and plumbing, fire protection, and structural.
DWG, PDF, RVT, and IFC, plus fabrication exports.
Built for the U.S. trades that build from BIM:

Ductwork and equipment detailed for fabrication and install.

Runs, supports, and penetrations are coordinated and detailed.

Sprinkler shop drawings coordinated trade to trade.

Detailed to your engineer’s connection design, ready for the shop.

Share a construction set or model. We will detail a sample to your standards in 2 to 3 days, so you see the quality before you commit.
A shop drawing that is not coordinated to the construction model is rework waiting to happen. Material cut to a clash gets cut twice. Drawings generated from a coordinated model clear review faster and keep your shop and your crews ahead of the schedule.
Send a real construction set or model. We detail a sample to your standards in 2 to 3 days.
Get a Free Sample →A named detailer embedded month to month, scaled to your awards.
Talk to a BIM Lead →A defined scope and fixed deliverables, detailed to your standards and the GC’s BEP.
Scope a Project →Pricing is scoped to the work, by the project or by the month. No long-term lock-in.
2,500+ projects across mechanical, plumbing, fire protection, and structural detailing.
Real offices in New Jersey and California, detailed to your standards and U.S. codes.
Drawings generated from a model coordinated to the construction set.
We work under NDA; every drawing and model is delivered to you.
You own the outcome. We own the production.

Share a construction set or model, and we will detail a sample to your standards in 2 to 3 days, so you can judge the quality before you commit.