BIM Services
Concept to fabrication — coordinated Revit models, clash-free federated files and drawing sets your field crews can build from.
All services
BIM Consulting
Standards, workflows and ISO 19650 processes that make BIM repeatable across every project your firm takes on.
All services
Staffing & Design Support
Trained modelers and engineers working in your time zone, to your standards — scale up in days, not hiring cycles.
BIM Staffing
Design Support
BIM insights, how-tos and industry deep dives for AEC teams.
Free downloadable guides for precon, VDC and BIM leaders.
Monthly BIM insights and project lessons in your inbox.
ROI Calculator and ISO 19650 readiness checklist.
Real projects with results in numbers, across five verticals.
Walkthroughs, model demos and project explainers.
What Is BIM Coordination? Clash Detection, LOD, and the Federated Model Explained
In-House BIM Team vs Outsourcing: What It Actually Costs a U.S. Firm
ISO 19650 Explained: What U.S. AEC Firms Need to Know Before Their Next Bid
Read more40-Story Office Tower, Dallas — 12 Trades Coordinated Clash-Free
420,000 sq ft of Class A commercial delivered at LOD 350 — full coordination, clash resolution and model-linked quantity takeoffs across every discipline.
Get to know how, since 2004, Excelize grew into the BIM partner U.S. AEC firms trust — 300+ clients served and 2,500+ projects delivered end to end.
Learn MoreWho We Are
How We Work
Trust
Careers
A documented BIM roadmap, standards, and a BIM Execution Plan built around your firm, not a downloaded template, so every project starts from a plan instead of starting over.
Most firms don't lack BIM skills. They lack a documented strategy: a roadmap that says what LOD to model to, which standards apply, and who owns the BEP once the person who wrote it moves on. Excelize builds that roadmap once, for architecture, MEPF, and general contracting firms, so your team stops re-deciding it on every job.
BIM Strategy Consulting is the work of building a firm’s BIM roadmap: standards, phase-by-phase LOD targets, governance, and a repeatable BEP template every project draws from, instead of each team inventing its own approach. Where Capability Assessment measures where you stand today, Strategy Consulting builds the plan for where you go next. Excelize baselines that plan against ISO 19650 information management principles and current LOD standards, recognized industry frameworks, not an internal opinion.
A firm bidding on healthcare, data center, or large commercial work gets asked for a BEP before the RFP is even scored and doesn't have one to send.
A roadmap gets written once, filed away, and every new office or project team ends up inventing its own version of the standard.
A maturity claim with no way to back it up: a firm says it’s "BIM mature" in a proposal, but can’t point to a documented framework behind that claim.
That gap costs more than an awkward proposal answer. It's the difference between a firm that gets shortlisted and one that doesn't, on the exact projects worth winning.
A phased plan for the next 12 to 24 months, tied to the project types your firm is actually bidding on.
Mapped to AIA G202/E201 and the BIMForum LOD Specification, so “coordination-ready” means the same thing on every project.
Built to NBIMS-US, structured so your PMs can adapt it project to project instead of writing one from scratch.
Who owns the standard, how often it’s reviewed, and what happens when your software stack or project mix changes.
Built around what you already run, Autodesk Construction Cloud, BIM 360, or Revizto, not a forced migration.
Your current practice evaluated against ISO 19650 and LOD standards, so you know exactly where you’re starting from.
We interview your BIM leads, pull your last three project models, and evaluate your current practice against ISO 19650 and LOD standards.
We write the roadmap and BEP template in two passes: a first draft your leadership reviews, then a working version your PMs pilot.
We run the new standard on one live project before it becomes firm-wide policy, so we catch what doesn't work while it's still cheap to fix.
Once the pilot holds up, we roll the standard out to the rest of your offices and project types, staged, not all at once.
We hand you the governance calendar and sit in on the first scheduled review, then it's yours to run.
Architecture firms get standards that protect fixed-fee margins across every project, not just the one they're currently staffed for. MEPF firms get LOD and coordination standards built to win complex, high-value work like data centers and healthcare. General contractors get one standard applied consistently across every office, so coordination quality doesn't depend on which PM is running the job.
Whichever you are, the engagement scopes around your firm's structure, not a fixed package size. Consultants work out of New Jersey and California, on U.S. hours, against U.S. codes and AHJ requirements.
The audit: an honest, benchmarked read on where your firm stands today.
ExploreThe plan executed on real projects, with the training to run it.
ExploreCOBie-compliant asset data captured progressively through construction.
ExploreEither tells us something useful. A BEP shows us what's already working and what isn't. No BEP tells us you're starting fresh, which changes how we scope the engagement. Send what you have, and a capability read comes back in 2 to 3 days.